My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
18-Grand Theater Hazardous Materials Remediation Phase I Project
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2011
>
05 May
>
05/09/2011
>
18-Grand Theater Hazardous Materials Remediation Phase I Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2011 5:17:40 PM
Creation date
5/5/2011 5:17:37 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
18
Doc Type
Agenda
CITY CLERK - Date
5/9/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> May 2, 2011 <br /> <br /> <br /> <br /> Mr. Shawn Napier, P.E. <br /> City of Paris <br /> 150 S. E. 1" Street <br /> Paris, Texas 75460 <br /> <br /> Phone: (903)-784-9292 <br /> Email: snappier@padstexas.gov <br /> <br /> Re: Hazardous Materials Remediation Bid Summary <br /> Grand Theater - Phase I <br /> 21 Lamar Avenue <br /> Paris, Texas 75460 <br /> Terracon Project No. 94107645 <br /> <br /> Dear Mr. Napier, <br /> <br /> The following table identifies the bids received for the referenced Hazardous Materials <br /> Remediation project from the Contractors who participated in the bid process. The bids are <br /> based on the scope of work in the Hazardous Materials Remediation document dated April 11, <br /> 2011, and Addendum-1, dated April 18, 2011, prepared by Terracon Consultants, Inc <br /> (Terracon). Table 1.0 identifies the Contractors and their corresponding bid prices. <br /> <br /> Table 1.0, BID SUMMARY <br /> <br /> Total Environmental NCM <br /> Abatement Remediation Demolition and HP Mustang <br /> Systems Corp. Services Sisk-Robb Inc. Remediation Environmental Remediation <br /> Base Bid $48,167.00 $72,650.00 $76.200.00 $87,770.00 $1103,690.00 $491,150.00 <br /> Alternate 1 $750.00 $7,500.00 $900.00 $1,800.00 $900.00 $2 500.00 <br /> Alternate 2 $2,500.00 $15,000.00 $9,700.00 $2,500.00 $2100.00 5100.00 <br /> Alternate 3 -.55,:0~•.GO $14,000.00 $0.00 $0.00 $0.00 $0.00 <br /> Total 5415,917.00 $109,150.00 $86,800.00 $92,070.00 $106W.00 $498,750.00 <br /> <br /> <br /> Total Abatement Systems Corporation (TASCO) provided the lowest bid for the hazardous <br /> materials remediation project. Terracon has evaluated the bid package presented by TASCO, <br /> the pricing for Alternates 1, 2 and 3 addressed in Addendum-1, and the TASCO proposed <br /> remedial procedure for fungal remediation (Alternate 3) using sodium bicarbonate versus <br /> carbon dioxide. <br /> <br /> Terracon Consultants, Inc. 8901 Carpenter Freeway, Suite 100 Dallas, Texas 75247 Registration No. F-3272 <br /> P 12141 630 1010 F (2141 630 7070 terrecon.com <br /> <br /> Construction 195 <br />
The URL can be used to link to this page
Your browser does not support the video tag.