My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-041 RES APPROVING CHANGE ORDER NO 1 TO THE CONTRACT BETWEEN RK HALL AND THE CITY OF PARIS
City-of-Paris
>
City Clerk
>
Resolutions
>
2011-2020
>
2011
>
2011-041 RES APPROVING CHANGE ORDER NO 1 TO THE CONTRACT BETWEEN RK HALL AND THE CITY OF PARIS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 11:01:28 AM
Creation date
5/20/2011 11:41:54 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2011-041
Doc Type
Resolution
CITY CLERK - Date
5/9/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER <br />Order No. One <br />Date: April 6, 2011 <br />Agreement Date: Julv 1, 2010 <br />NAME OF PROJECT: South Colle~-,iate Drive Reconstruction <br />OWNER: Citv of Paris <br />CONTRACTOR: R. K. Hall Construction LTD <br />The following changes are hereby made to the CONTRACT DOCUMENTS: <br />1) Install one fire hydrant extension @$260/each -$260.00. <br />2} Remove 797.33 SY concrete pavement (average 12" thick) @$10.00/SY =$7,973.30. <br />3) 90 calendar day time extension. <br />Justification: <br />1) Depth of exisring water main unknown until location for new fire hydrant was excavated. <br />2) Existing concrete pavement was underneath existing asphalt pavement. <br />3) Due to easement acquisition and utility relocation delays not controlled by contractor. <br />Change to CONTRACT PRICE: <br />Original CONTRACT PRICE: <br />$1,465,740.40 <br />Current CONTI2ACT PRICE adjusted by previous CHANGE ORDER $ 1,465,740.40 <br />The CONTRACT PRICE due to this CHANGE ORDER will be increased by: $ 8,233.30 <br />The new CONTR.ACT PRICE including this CHANGE ORDER will be $ 1,473,973.70 <br />Change to CONTRACT TIME: <br />The CONTRACT TIME will be increased by 90 calendar days. <br />The date for completion of all work will be July 27, 2011 <br />Approvals Required: <br />To be effective this Order must be approved by the Federal agency if it changes the scope or <br />objective of the PROJECT, or as may otherwise be required b the SUPPLEMENTAL <br />GENERAL CUNDITIONS. <br />O,F <br />Owner: <br />Engineer: ! ~l' (o " <br />HayEAr En eering, Inc. TBPE F-000315 , <br />Contractor: <br />CONTRACT DOCUMENTS FOR CONS'IRUCTION OF L7,',:c- orDocument No. 10 <br />FEDERALLY AS5ISTED WATER AND SEWER PROJECI'S tdtft <br />F~ ~......r` ~ Order. Page 1 of 1 <br />a~~VkAL ti~ ~..e <br />EX ~ „ ~ <br />•b`.~. I/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.