My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-043 RES AWARDING A CONTRACT TO TOTAL ABATEMENT SYSTEMS CORP
City-of-Paris
>
City Clerk
>
Resolutions
>
2011-2020
>
2011
>
2011-043 RES AWARDING A CONTRACT TO TOTAL ABATEMENT SYSTEMS CORP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 11:03:18 AM
Creation date
5/20/2011 11:52:28 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2011-043
Doc Type
Resolution
CITY CLERK - Date
5/9/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Irerracon <br />8901 Carpenter Freeway, Suite 100 <br />Dallas, Texas 75247 <br />214-630-1010 <br />Project Overview <br />This project consists of the remediation of hazardous materials at the Proposed Murphy <br />Community Center including asbestos containing materials (ACM), lead based paint building <br />components and building materials which exhibited fungal contamination. The site specific <br />asbestos abatement design, lead abatement work plan, and fungal remediation protocol, are <br />provided in separate sections within this document. In building work areas where asbestos <br />abatement, lead abatement and fungal remediation overlap, the more stringent remedial work <br />practice, based on state and federal regulations, will take precedent. <br />It is important to note that the building has historical significance and it is the Owner's intent to <br />preserve the identified original components of historical value throughout the remediation <br />project. <br />The contractor will perform the hazardous materials remediation in a sequence that ensures <br />compliance with applicable state and federal asbestos, lead and fungal regulations. The defined <br />sequencing will avoid combining regulated waste generated as part of the remediation. The <br />contractor will provided a detailed schedule of the remediation sequence which will include at a <br />minimum containment and non-containment areas, regulated areas, order in which identified <br />hazardous materials will be remediated, waste packaging, and disposal to ensure regulatory <br />compliance with applicable state and federal regulations. <br />The Contractor selected to perform the remediation work will demonstrate experience <br />performing abatement of each of the hazardous materials identified. Prior to beginning work at <br />the site the Contractor will attend a preconstruction meeting to coordinate all site activities with <br />the Owner and their designated representative. In addition prior to beginning any remediation <br />activities the contractor will conduct an orientation meeting with their personnel. The purpose of <br />the meeting will be to inform each employee of the historical significance of the structure and <br />the specific procedures to be followed in protecting the finishes and fixtures that are in each <br />work area. <br />■ ■ <br />
The URL can be used to link to this page
Your browser does not support the video tag.