My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-043 RES AWARDING A CONTRACT TO TOTAL ABATEMENT SYSTEMS CORP
City-of-Paris
>
City Clerk
>
Resolutions
>
2011-2020
>
2011
>
2011-043 RES AWARDING A CONTRACT TO TOTAL ABATEMENT SYSTEMS CORP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 11:03:18 AM
Creation date
5/20/2011 11:52:28 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2011-043
Doc Type
Resolution
CITY CLERK - Date
5/9/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Work - Asbestos Abatement Irerracon <br />Grand Theatre m 21 Lamar Avenue, Paris, i exas <br />April 14, 2011 m Terracon Projeci No. 94107645 <br />Equipment Rooin (coniaminated area): Require work equipmeni, footwear and <br />additional contaminated work clothing to be leit here. This is a change and transii area <br />for workers. Separate this room from the work area by a G mil polyethylene flap <br />doorway. Separafie fhis roaiii irom the rest of fhe building wifh air~tighf walls fabricated of <br />6 mil polyethylene sheeting. Separate this room from the Shower Room and Wark Area <br />with airtight walis fabricated of 6 mil polyethylene sheeting. <br />Work Area: Separate work area from the Equipment Room by polyethylene barriers. !f <br />the airborne asbestos level in the work area is expected to be high, as in dry removal, <br />add an intermediate cleaning space between the Equipment room and the Work area. <br />Damp wipe clean afl surFaces after each shift change. Provide one additional floor layer <br />of 6 mil polyethylene sheeting per shift change and remove contaminated layer after <br />each shift. <br />Waste Load Out Area: the CONTRACTOR will conduct the waste load out in areas <br />separate from any non-project personnel or passers-by. <br />3.4 Removal <br />The CONTRACTOR will perform the removal and disposal in accordance with current <br />local, state and federal regulations. <br />Texture associated with Wall Plaster: Spray asbestos containing material(s) with <br />amended water or removal encapsulant. Aliow time for amended water or removal <br />encapsulant to saturate the material. Do not over saturate to cause excess dripping. if <br />amended water is used, spray material repeatedly during the work process to maintain a <br />continuously wet condition. The textured wall plaster will be removed, exposing the brick <br />substrate. The clean surFaces will be encapsulated after passing a visual inspection <br />conducted by a Terracon representative. The abated material will be bagged and <br />disposed of in accordance with the asbestos abatement design. <br />Floor Tile/Mastic (interior/exterior): Spray asbestos containing flooring/mastic with <br />amended water or removaf encapsulant. Allow time for amended water or removal <br />encapsulant to saturate the material. Do not over saturate to cause excess dripping. <br />The flooring/mastic will be removed from the substrate. Once the flooring is removed the <br />mastic remover may be applied to the floor mastic remaining on the substrate (where <br />applicable). If mastic remover is used it will have a flash point greater than 140 degrees <br />Fahrenheit. The mastic will be removed using a mopping action or with the use of low <br />speed buffers. The clean surfaces wilf be encapsulated after passing a visual inspection <br />conducied by a Ten-acon representative. The abated material will be bagged and <br />disposed in accordance with the asbestos abatement design. <br />~ <br /> <br />+'Jiul <br />
The URL can be used to link to this page
Your browser does not support the video tag.