Laserfiche WebLink
Scape of Work - Asbestos Abatement Irerracon <br />Grand Theatre ■ 21 Lamar Avenue, Paris, I exas <br />April 14, 2011 ■ Terracon Project No. 94107645 <br />4. The waste will be disposed in an approved Iandfill. The waste will be <br />transported to the landfill in a lined closed top receptacle. Verification of <br />aisposal at the landfill will be provided to the OWNER by CONTRACTOR via <br />the Uniform Hazardaus Waste Manifest signed by the landfiil. . <br />5. The waste will be transported to the landfill in a lined closed top receptacle. <br />Verification of disposal at the landfiil wiil be provided to the OWNER by <br />CONTRACTOR via the Uniform Hazardous Waste Manifest. <br />3.6 Clearance <br />Aggressive PCM clearance sampling will be conducted in accordance with the NIOSH <br />7400 Method, in each contained area in which abatement has occurred. <br />4.0 CONTRACTOR SUBMITTALS <br />Submittals required for proper execution include but are not limited to the following: <br />Pre-Construction Submittals (submitted to CONS.llLTANT): <br />Regulatory Notification Information <br />Plan of Action <br />Fire Action Plan <br />Emergency Phone List <br />Project Schedule <br />Copy of Written Respirator Program which conforms to 29 CFR 1910.134(b) <br />OSHA Material Safety and Data Sheets (Product Handling) <br />Negative initial Exposure Assessment <br />Construction Submittals (submitted to CONSULTANT before start of work on-site) <br />Licenses: CONTRACTOR, Supervisor, Transporter(s) <br />NESHAP Training Certificate <br />Personal Air Monitoring Lab Results <br />List of Workers <br />Worker Registration Certificates <br />Medical Examination Results <br />Worker Training Certificates <br />Respiratory Fit Test Certificate <br />Employee Fail Protection Training <br />Certificates of Worker Acknowledgement <br />■ ■ _ TC ~ Lic ~ C_ <br />