Fungal-Biological Hazard Remediation Protocol Irerracon <br />Grand Theater ■ 21 Lamar Street, Paris, Texas <br />April 11, 2011 m Terracon Project No. 94117645 <br />of half face dual cartridge air purifying respiratars with NEPA cartridges (N-100), and the <br />remedial work conducted on the second floor will require the use of Powered Air Purifying <br />Respirators (PAPR), specifically during pigeon related biological-hazard rerriediation. <br />Terracon has documented the presence of asbestos containing materials (ACM) and lead <br />based paint (LBP) in the walls of the first floor lobby. The abatement of ACM and LBP wiil be <br />conducted prior to fungal remediation. The asbestos abatement specifications are provided <br />in Scope of Work for Hazardous Materials Abatement, Terracon Project No. 94107645. <br />1.0 SAFETY PRACTICES <br />The contractor is responsible for all OSHA safety practices associated with worker <br />protection. In addition, the contractor shall ensure that all electrical and fire hazard safety <br />protocols are followed in compliance with typical construction regulations. It is the <br />contractor's responsibility to ensure that workers on scaffold platforms or working from <br />ladders or other elevated platforms should be safe and secure from slipping or falling. <br />2.0 ACCESS TO WORK AREA <br />A secure work area will be established. Only licensed/registered individuals qualified to <br />wear respiratory protection will enter the vacant building work area during the project. The <br />contractor will ensure that access to the work area is periodically monitored. <br />3.0 MOVEABLE/NON-MOVEABLE OBJECTS <br />Not applicable. <br />4.0 HEATING, VENTILATION, AND AIR CONDITIONING SYSTEM EQUIPMENT <br />Not applicable. <br />5.0 DECONTAMINATION SYSTEM <br />a) The first floor lobby remediation work area will be entered through the <br />decontamination system previously constructed for the ACM-LBP abatement as <br />referenced in Scope of Work for Hazardous Materials Abatement, Terracon Project <br />No. 94107645. <br />b) The second floor remediation work area will be accessed from the second floor of the <br />adjacent, attached building. A worker decontamination enclosure system shall be <br />installed for entry into the second floor containment and shall consist of a two-stage, <br />dry ciecontarnination unit constructed of six (6) millimeter polyethylene. Disposable <br />. . ~ <br />F~'=_g)i.ts3.-3~'c-`. ! ~°c i':.~ "6C.-:'14ii ■ $?~~ff1~.;:~ <br />.',~u----- - NtAC 0 i 07/1i-10-12 <br />