My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-043 RES AWARDING A CONTRACT TO TOTAL ABATEMENT SYSTEMS CORP
City-of-Paris
>
City Clerk
>
Resolutions
>
2011-2020
>
2011
>
2011-043 RES AWARDING A CONTRACT TO TOTAL ABATEMENT SYSTEMS CORP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 11:03:18 AM
Creation date
5/20/2011 11:52:28 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2011-043
Doc Type
Resolution
CITY CLERK - Date
5/9/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fungal-Biological Hazard Remediation Protocol Irerracon <br />Grand Theater o 21 Lamar Street, Paris, Texas <br />April 11, 2011 ■ Terracon Project No. 94117645 <br />7.0 VENTILATION <br />a) ?he firs± floor lobby remediation work area will be ventilated with the previously <br />established ventilation system as defined for the ACM-LBP abatement as referenced <br />in Scope of Work for Hazardous Materials Abatement, Terracon Projecfi No. <br />94107645. Containment/critical barriers must remain in place until interim written <br />notification of post remediation clearance has been received from the MAC. <br />b) The second floor containment must be maintained at a negative pressure differential <br />of 5 Pascal, or, 0.02 inches of water, with HEPA filtered negative air machines <br />(NAMS) that are exhausted to the immediate outdoor environment. The containment <br />should have a minimum of four (4) air changes per hour and shall be operated <br />continuously for the duration of the project. The negative pressure differential will be <br />continuously monitored with a manometer. The containment/critical barriers must <br />remain in place until interim written notification of post remediation clearance has <br />been received from the MAC. <br />8.0 PPE DURING FUNGAL REMEDIATION <br />a) Workers will wear personal protective equipment consisting of, at a minimum, half <br />face dual cartridge air purifying respirators with HEPA cartridges (N-100) and full <br />body disposable coveralls while performing remedial work in the first floor lobby. <br />b) Workers will wear PAPR in the second floor containment. <br />It is the Contractor's responsibility to ensure that his employees are afforded the respiratory <br />protection as required by the OSHA standard for respiratory protection (29 CFR 1910.134, <br />December, 2008) or the respiratory protection requested by the employee. The Contractor <br />shall ensure the workers are instructed and trained in the proper use, maintenance, and <br />care of respiratory protection in accordance with Title 29 CFR 1910.134. Safety glasses, <br />disposable coveralls, and work gloves must be worn while working in the contained areas. It <br />is the contractor's responsibility to ensure that workers on scaffold platforms or working from <br />ladders or other elevated platforms should be safe and secure from slipping or falling. <br />9.0 CLEANING/DECONTAMINATION <br />Option 1-Mechanical Cleaninq of Non-Porous and Semi-Porous Substrates <br />Mechanical cleaning and decontamination procedures shall use HEPA vacuuming and wet <br />wiping. Wet wiping should be performed with water amended with a non-ionic detergent. <br />An appropriately labeled and EPA registered biocide may be used on non-porous or semi- <br />porous substrates. A wire brush or other abrasive techniques wili be requircd to clean non- <br />4 <br /> <br />fVfAG 0 i 07/1 'I - i 0-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.