My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-043 RES AWARDING A CONTRACT TO TOTAL ABATEMENT SYSTEMS CORP
City-of-Paris
>
City Clerk
>
Resolutions
>
2011-2020
>
2011
>
2011-043 RES AWARDING A CONTRACT TO TOTAL ABATEMENT SYSTEMS CORP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 11:03:18 AM
Creation date
5/20/2011 11:52:28 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2011-043
Doc Type
Resolution
CITY CLERK - Date
5/9/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Work - Lead Paint Abatement Irerracon <br />Grand Theatre a 21 Lamar Avenue, Paris, Texas <br />April 11, 2011 m Terracon Project No. 94107645 <br />3.0 WORK PRACTICES <br />3.1 Respiratory Protection <br />Throughout the project, respirators shall be provided by the Contractor. The Contractor <br />will provide respirators which are applicable and suitable for the purpose intended in <br />accordance with OSHA 1910.134 - Respirator Standard. The Contractor will ensure <br />that the respirators are equipped with filter cartridges designed for lead paint, dusts and <br />mists, vapors, and color-coded in accordance with ANSI Z228.2 (1980). <br />3.2 Protective Clothing <br />During removal of the loose and flaking LBP, at least one protective suit will be worn by <br />each worker. Boots and gloves will be made available to each worker as needed. All <br />protective suits will be properly disposed of at the conclusion of the work. The workers <br />performing the abatement wili decontaminate thoroughly in three-chambered wet <br />decontamination system attached to each containment. <br />3.3 Containment <br />The LBP will be abated in the full containment constructed for the asbestos abatement <br />as defined in the asbestos abatement design. <br />3.4 Removal <br />The CONTRACTOR will perform the removal and disposal of the damaged flaking paint <br />in accordance with current applicable local, state and federal regulations. The Contractor <br />will minimize the creation of lead contaminated dust and airborne particles using <br />methods and procedures that create the least amount of dust. <br />3.5 Disposal <br />This section describes the disposal of lead containing or lead contaminated components <br />and/or waste materials. Disposal includes packaging of all non-metal waste materials <br />and shall be accomplished by land filling or incineration as appropriate. Approval by <br />OWNER is required prior to all recycling or disposal activities. <br />Testing of waste will be performed to determine disposal requirements. The testing shall <br />be conducted by the Owner's Representative. The Owner's Representative shall verify <br />that all the waster has been properly segregated, containerized, and classified in the <br />following categories: <br />m m 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.