My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
18-Contract for the demolition and disposal of dilapidated structures to Sanitation Solutions
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2011
>
06 June
>
06/27/2011
>
18-Contract for the demolition and disposal of dilapidated structures to Sanitation Solutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2012 8:22:50 AM
Creation date
6/24/2011 10:22:33 AM
Metadata
Fields
Template:
CITY CLERK
Doc Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.2 DIRECTOR OF ENGINEERING, PLANNING AND DEVELOPMENT designates for <br />demolition various properties located througliout the city. Those designated properties <br />may be modified at any time during the course of the Contract by either addition or deletion <br />of properties, and the properties may be submitted to the CONTRACTOR in no particular <br />order and in no particular quantity at one time. <br />4.3 The submission of a Bid will constitute an incontrovertible representation by Bidder that <br />Bidder has complied with every requirement of this Article 4, that without exception the <br />Bid is premised upon performing and furnishing the Work required by the Contract <br />Documents and such means, methods, techniques, sequences, or procedures of demolition <br />as may be indicated in or required by the Canh-act Documents, and that the Contract <br />Documents are sufficient in scope and detail to indicate and convey understanding of all <br />terms and conditions for performance arrd fumishing of the Work. <br />Internretations and Addenda <br />5.1 All questions about the meaning or intent of the Contract Documents are to be directed to <br />DIRECTOR OF ENGINEERING, PLANNING AND DEVELOPMENT. Interpretations <br />or clarifications considered necessary by DIRECTOR OF ENGINEERING, PLANNING <br />AND DEVELOPMENT in response to such questions will be issued by Addenda mailed or <br />delivered to all parties recorded by DIRECTOR OF ENGINEER.ING, PLANNING AND <br />DEVELOPMENT as having received the Bidding Documents. Questions received less <br />than seven (7) days prior to the date for apening of Bids rnay not be answered. Only <br />questions answered by formal written Addenda will be binding. Ora1 and other <br />inteipretations or clarifications will be without legal effect. <br />52 Addenda may also be issued to modify the Bidding Documents as deemed advisable by <br />OWNER or DIRECTOR OF ENGINEERING, PLANNING AND DEVELOPMENT. <br />Contract Tirne <br />6.1 After award and upon receipt by OWNER of all signed contracts and bond and other <br />documents associated with this project, DIRECTOR OF ENGINEERING, PLANNING <br />AND DEVELOPMENT will submit a list of structures to CONTR.ACTOR shown in order <br />of priority. Upon completion of each list, CONTRACTOR rnust contact DIRECTOR OF <br />ENGINEERING, PLANNING AND DEVELOPMENT for a new list of structures. <br />Nothing in these bid documents shall require OWNER to expend more than that amaunt <br />budgeted for this purpose as approved by the City Council of the City of Paris. <br />6.2 All work associated with this project must be completed within twelve (12) months from <br />the date of cantract execution <br />6.3 The Directar of Engineering, Pla.nning, and Development, or his authorized designee, shall <br />issue work orders throughout the term of this agreement and a11 work called for in the work <br />3 <br />235 <br />! <br />
The URL can be used to link to this page
Your browser does not support the video tag.