Laserfiche WebLink
CITY OF PARIS <br />UTILITIES DEPARTMENT <br />BID SPECIFICATIONS <br />FOR FURNISHING LIOOID CATIONIC POLYACRYLAMIDE EMULSION <br />(FLOCCULANT A1D) <br />REUUIREMENTS <br />IT IS ESTIMATED THAT 50.000 LBS. OF LIOUID CATIONIC POLYACRYLAMIDE <br />EMtJLSION WILL BE REQUIRED IN THE OPERATION OF THE WASTEWATER TREATMENT <br />PLANT DURING THE PERIOD OCTOBER 1, 2011 THROUGH SEPTEMBER 30, 2012. THIS <br />PRODUCT IS USED IN THE DE-WATERING OF SLUDGE. ROTARY DRUM THICKENERS ARE <br />USED TO THICKEN (DE-WATER) THE SLUDGE AFTER THE INJECTION OF THIS POLYMER. <br />AN EXACT QUANTITY CANNOT BE DETERMINED, BUT AN ESTIMATE IS GIVEN ABOVE. <br />QUANTITIES MAY BE INCREASED OR DECREASED TO MEET THE REQUIREMENT OF THE <br />OPERATIONS OF THE PLANT DURING THE PERIOD SHOWN ABOVE. A MINIMUM IS NOT <br />GUARANTEED. <br />A PURCHASE ORDER WILL BE AWARDED TO THE SUCCESSFUL BIDDER AS A RESULT <br />OF THIS INVITATION TO BID. <br />THE BIDDER MAY CANCEL THE CONTRACT AT THE CONCLUSION OF THE CONTRACT <br />PERIOD SHOWN ABOVE BY GTVING 60 DAYS PRIOR NOTICE IN WRITING. <br />SPECIFICATIONS <br />WE PRESENTLY USE POLYDYNE CI-10$0. THE PRODUCT BID MUST BE EQUAL OR <br />SUPERIOR TO THIS PRODUCT. <br />ANALYSIS OF PRODUCT DELIVERED SHALL BE FURNISHED BY BIDDER WHEN <br />REQUESTED BY THE CITY OF PARIS. <br />A STATEMENT AS TO THE ORIGIN OF THE SUPPLIED PRODUCT SHALL BE FURNISHED <br />BY BIDDER WHEN REQUESTED TO DO SO BY THE C1TY OF PARIS. <br />DELIVERIES <br />DELNERIES WILL BE MADE TO THE WASTEWATER TREATMENT PLANT AT 8600 <br />NORTH MAIN, PARIS, TEXAS 75460. <br />DELIVERIES ARE TO BE MADE 1N LOTS OF APPROXIMATELY 1800 POUNDS PER <br />SHIPMENT. SHIPMENT SHOULD BE MADE IN F1FTY-FIVE (55) GALLON DRUMS ON FOUR- <br />WAY WOODEN PALLETS. THERE SHALL NOT BE MORE THAN TWO DRUMS ON ANY <br />PALLET. THE DELIVERY TRUCK SHALL BE CAPABLE OF SETTING A LOADED PALLET ON <br />THE DOCK AT GROtJND LEVEL. <br />ROUTINE DELNERIES MUST BE MADE WITHIN THE HOURS OF 8:30AM TO 3:30PM, <br />MONDAY THROUGH FRIDAY. DELIVERY MUST BE MADE WITAIN THREE (3) DAYS <br />FOLLOWING A CONFIRMED REOUEST FOR EACH DELIVERY. <br />105 <br />