My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-Bids for chemicals to be used at the Water and Wastewater Treatment Plants
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2011
>
08 August
>
08/08/2011
>
10-Bids for chemicals to be used at the Water and Wastewater Treatment Plants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 4:30:04 PM
Creation date
8/4/2011 2:31:15 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF PARIS <br />UTILITIES DEPARTMENT <br />BID SPECIFICATIONS <br />FOR FURNISHING LIOUID CHLORINE <br />IT IS ESTIMATED THAT ONE HUNDRED (100) TONS OF LIQUID CHLORINE WILL BE <br />REQUIRED IN THE OPERATION OF THE WATER TREATMENT PLANT AND FIFTY (50) TONS <br />OF LIQUID CHLORINE WILL BE REQUIRED IN THE OPERATION OF THE WASTER'ATER <br />TREATMENT PLANT DURING THE PERIOD OCTOBER 1, 2011 THROUGH SEPTEMBER 30, 2012. <br />EXACT QUANTITIES CANNOT BE DETERMINED, BUT ESTIMATES ARE GNEN AS <br />SHOWN ABOVE. QUANTITIES MAY BE INCREASED OR DECREASED TO MEET THE <br />REQUIREMENT OF THE OPERATIONS OF THE PLANTS DURING THE PERIOD SHOWN ABOVE. <br />A M1NIMUM IS NOT GUARANTEED. <br />A PURCHASE ORDER WILL BE AWARDED TO THE SUCCESSFUL BIDDER AS A RESULT <br />OF TH1S INVITATION TO BID. <br />THE BIDDER MAY CANCEL THE CONTRACT AT THE CONCLUSION OF THE CONTRACT <br />PERIOD SHOWN ABOVE BY GIVING 60 DAYS PRIOR NOTICE IN WRITING. <br />SPECIFICATIONS <br />CHLORINE DELIVERED SHALL CONFORM TO AWWA STANDARD B301-92 AND BE NSF <br />APPROVED. <br />ANALYSIS OF PRODUCT DELIVERED SHALL BE FURNISHED BY BIDDER WHEN <br />REQUESTED BY THE CITY OF PARIS. <br />A STATEMENT AS TO THE ORIGIN OF THE SUPPLIED PRODUCT SHALL BE Fi.JRNISHED <br />BY BIDDER WHEN REQUESTED TO DO SO BY THE CITY OF PARIS. <br />DELIVERIES <br />DELIVERIES WILL BE MADE TO THE WATER TREATMENT PLANT AT 3700 LAKE CROOK <br />ROAD, PARIS, TEXAS 75460 AND THE WASTEWATER TREATMENT PLANT AT $600 NORTH <br />MAIN, PARIS, TEXAS 75460. <br />DELIVERIES ARE TO BE MADE IN ONE-TON CYLINDERS. THE CTTY OF PARIS WILL <br />MAKE EVERY EFFORT TO ACCEPT DELIVERIES IN TRUCK LOAD LOTS. LOTS MAY BE <br />SPLIT BETWEEN THE TWO PLANTS AS NECESSARY. <br />DELIVERY TRUCK MUST BE CAPABLE OF SETTING CYLINDERS OFF TRUCK AND ON TO <br />OUR LOADING AREA SO WE CAN PICK IT UP W1TH OUR CRANE. <br />ROUTINE DELIVERIES MUST BE MADE WITHIN THE HOURS OF 8:30AM TO 3:30PM, <br />MONDAY THROUGH FRIDAY. DELIVERY MUST BE MADE WITHIN THREE (3) DAYS <br />FOLLOWING A CONFIRMED REQUEST FOR EACH DELIVERY. <br />83 <br />
The URL can be used to link to this page
Your browser does not support the video tag.