My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23-ACCEPTING BID AND CONTRACT FOR $71,777.00 FOR HAZARDOUS MATERIALS REMEDIATION OF GRAND THEATER
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2011
>
08 August
>
08/22/2011
>
23-ACCEPTING BID AND CONTRACT FOR $71,777.00 FOR HAZARDOUS MATERIALS REMEDIATION OF GRAND THEATER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 4:34:23 PM
Creation date
8/19/2011 3:22:04 PM
Metadata
Fields
Template:
CITY CLERK
Doc Type
Agenda
CITY CLERK - Date
8/22/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. All waste disposal vehicles and/or containers used to transport or store waste <br />materials shall be properly labeled in accordance with the requirements of 40 CFR <br />61.152. All such vehicles and/or containers shall be poly lined to the extent needed to <br />maintain a leak tight status until waste is delivered to authorized landfill. <br />4.6 Air Monitoring <br />A. Air monitoring for asbestos exposure levels shall be performed daily throughout <br />all phases of demolition work which disturbs asbestos contaminated materials. <br />CONTRACTOR shall insure that personnel responsible for collecting and <br />analyzing samples are properly licensed by the Texas Department of State Health <br />Services. Personnel having full NIOSH 582 training and/or Texas licensing shall <br />be on site to perform the required air monitoring. All samples shall be analyzed <br />by a Texas licensed asbestos laboratory. CONTRACTOR shall be responsible for <br />ensuring that all costs related to air monitoring are included in his bid. <br />B. Ambient air samples shall be collected on a daily basis during all work involving <br />the disturbance of asbestos-containing materials. Ambient samples shall be <br />collected at the following locations: <br />• Upwind <br />• Two Downwind Locations <br />• Track Hoe Cab Exterior <br />C. CONTRACTOR shall also collect personal samples on his workers in accordance <br />with OSHA regulations during all demolition operations. <br />D. CONTRACTOR shall supply CITY with copies of personal and ambient sample <br />analysis results within 24 hours of the date of analysis. CONTRACTOR shall <br />post the sample results for the workers to review on his notice board. <br />E. Daily logs shall record all sample locations and personnel affected by monitoring <br />results. <br />4.7 Licensing/Submittals <br />A. CONTRACTOR is considered exempt from the state asbestos licensing <br />requirements of the Texas Asbestos Health Protection Act. All supervisors and <br />workers involved with the project shall be EPA accredited and shall have current <br />medical evaluations and respirator fit tests in accordance with the OSHA <br />requirements of CFR 1926.1101. <br />B. Pre job Submittals - The following information shall be provided to CITY prior <br />to the start of work: <br />• 40 Hour Supervisor/Contractor Asbestos Training <br />• 32 Hour Worker Asbestos Training <br />• Air monitoring training/licensing <br />176 <br />
The URL can be used to link to this page
Your browser does not support the video tag.