the additional Delivery Point(s), including the acquisition of any easements or rights-of-way (the <br />"Adclitional Delivery Inzprovements"). The additional Delivery Point(s) shall be subject to all <br />applicable Regulatory Requirements. <br />(a) If Paris is to construct the Additional Delivery Improvements, Daisy Farins shall be <br />responsible for reimbursing Paris for the cost of the Additional Delivery Improvements. <br />Prior to beginning construction, the Parties shall enter into a written agreement for Daisy <br />Fai•ms (i) to approve the amount of anticipated construction costs and (ii) to specify the <br />manner and timeframe for such reimbursement to Paris and the time for construction. <br />(b) If Daisy Farms is to construct the Additional Delivery Improvements, Daisy Farms shall <br />submit documents to acquire rights-of-way a.nd/or easements and shall submit plans for the <br />construction of tlle Additional Delivery Improvements to Pai•is for approval prior to <br />construction cominencing; provided, however, such approval shall not be unreasonably <br />withheld or delayed. Paris will give Daisy Farms notice of such approval or disapproval in <br />writing within 45 days from receipt of such documents or plans. If Paris does not provide <br />notice of appi•oval or disapproval within such 45-day period, the documents or plans shall be <br />deemed approved. During thc construction of the Additional Delivery Improvements, Paris <br />may, but is iiot obligated to, inspect the Additional Delivery Improvements under <br />construction at its sole cost. All costs for the construction of the Additional Delivery <br />Improvements shall be borne by Daisy Farms. Paris may, but is not obligated to, make a <br />final inspection and approval, at its sole cost, after construction of the Additional Delivery <br />Improvements are completed and before the Additional Delivery Improvements are approved <br />for use; provided, however, such approval shall not be unreasonably withheld or delayed. <br />3.5 Improvements to Existing Delivery Point. If Daisy Farms requests that improvements be rnade to <br />a Delivety Point, Daisy Farms shall submit the request in writing to Paris. If Paris approves the <br />request, the Pai•ties shall then decide whether Paris or Daisy Farms will be responsible for <br />constructing the improvements and shall follow the procedures set forth in Section 3.4; provided, <br />however, such approval shall not be unreasonably withheld or delayed. <br />3.6 Wheeling of Water Through Treated Water Transmission Line. No party other than Paris may <br />use the Tceated Water Transmission Line to transport Water. <br />3.7 Valves at llelivery Point. All valves releasing water from the Paris Treated Water System to Daisy <br />Farms shall be solely operated and maintained by Paris. Daisy Farms shall not obstruct or block <br />access to those valves. <br />3.8 Property of Paris. Any acquired easements and/or rights-of-way shall name Paris as a grantee for <br />the portion of the easement and/or right-of-way on Paris' side of the Delivery Point. Upon the <br />completion of construction and final approval by Paris of any new, -relocated or improved Delivery <br />Yoint, the constructed improvenlents and metering device and appurtenances shall become the <br />property of Paris. <br />ARTICLE 4 <br />Metering and Rate of Flow Control <br />4.1 Treated Water Measurement and Control. Paris shall install a Meter(s) and appropriate valves, <br />back flow prevention, flow controllers, or other appropriate equipment at the Delivery Point to <br />measure and control the amount of Treated Water delivered to Daisy Farms under the terms of this <br />Page 7 of 23 <br />~ - 204 <br />