My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Draft Infiltration and Inflow Report March 1998
City-of-Paris
>
City Clerk
>
Annexation Ordinances
>
Draft Infiltration and Inflow Report March 1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 2:23:25 PM
Creation date
9/14/2011 4:20:51 PM
Metadata
Fields
Template:
EMS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and cast iron and range from 6 inches to 27 inches in diameter. In general, service <br />lines are 4 inches in diameter. <br />1. Existing Facilities <br />The existing wastewater collection system studied by ADS consists of 968,741 <br />linear feet of collection line, 928,939 linear feet being gravity mains, and 39,802 <br />lineaz feet being force mains. There are a total of 2653 access structures that <br />include 1624 manholes, 123 cleanouts, 144 tees, 748 end-of-line structures, and 14 <br />pump stations. The majority of the collection system is composed of 6" and 8" <br />pipes. Sewage generally flows northerly to the city's wastewater treatment plant. <br />ADS Environmental Services, Inc. <br />II-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.