My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-C Clottey Eng Bridge Repair
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2004
>
09 - September
>
2004-09-13
>
11-C Clottey Eng Bridge Repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2012 4:28:03 PM
Creation date
9/9/2004 9:21:19 AM
Metadata
Fields
Template:
AGENDA
Item Number
11-C Clottey Eng
AGENDA - Type
RESOLUTION
Description
Clottey Engineering Bridge Repair Design Contract
AGENDA - Date
9/13/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT - C <br />Fee Summary for Culverts Design in City of Paris, Texas <br />City of Paris Texas <br />CLOTTEY ENGINEERING,INC. <br />CONTRACT NO.: COP/CEI-001. <br />FUf1CtiOn <br />Function Name <br />Project <br />Manager <br />342.00 <br />Sr. Project <br />Engineer <br />$36.00 <br />Design <br />Engineer <br />$32.00 <br />Jr. Engineer <br />(EI~ <br />$24.00 <br />Sr. Engineer <br />Technician <br />$24.00 <br />rnginniear <br />chcia <br />18.00 <br />Sr. Environ <br />pecialist <br />$32.00 <br />Environ. <br />Specialis <br />$23.00 <br />Clerical <br />$15.00 <br />3-Man <br />Fieid Pa <br />$37.00 <br />RPLS <br />$30.00 <br />Survey <br />Technician <br />$19.00 <br />Totai <br />Hours <br />Direct Labor <br />Cost <br />DLC <br />Direct Labor <br />Tatal OH Cost <br />2.60 <br />CR 32900 <br />/ Thrasher Rd. <br />110 <br />Route and Desi n Stud <br />4 <br />4 <br />2 <br />8 <br />18 <br />$496.00 <br />$ 1,289.60 <br />120 <br />Environmental Stud <br />0 <br />$0.00 <br />$ - <br />130 <br />Ri ht-of-Wa Data <br />0 <br />$0.00 <br />$ - <br />150 <br />Field Surve in <br />4 <br />2 <br />4 <br />10 <br />$336.00 <br />$ 873.60 <br />160 <br />Roadwa Desi n Control <br />2 <br />8 <br />10 <br />$340.00 <br />$ 884.00 <br />161 <br />Draina e Desi n <br />8 <br />48 <br />24 <br />80 <br />$2,448.00 <br />$ 6,364.80 <br />162 <br />Si nin , Pavement Markin <br />0 <br />$0.00 <br />$ - <br />163 <br />Miscellaneous Roadwa <br />2 <br />4 <br />4 <br />10 <br />$308.00 <br />$ 800.80 <br />170 <br />Culvert Desi n <br />4 <br />8 <br />24 <br />36 <br />$1,000.00 <br />$ 2,600.00 <br />SUB-TOTAL <br />24 <br />6 <br />70 <br />56 <br />0 <br />0 <br />0 <br />0 <br />8 <br />0 <br />0 <br />0 <br />164 <br />$4,928.00 <br />$ 12,812.80 <br />$ - <br />Direct Costs <br />$ 265.28 <br />CEI Fixed Fee 15% <br />$ 1,921.92 <br />TOTAL <br />$ 15,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.