My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
21-C Streetscape Chg. Ord. #2
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2004
>
09 - September
>
2004-09-09
>
21-C Streetscape Chg. Ord. #2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2005 11:15:11 AM
Creation date
9/3/2004 10:37:41 AM
Metadata
Fields
Template:
AGENDA
Item Number
21-C
AGENDA - Type
RESOLUTION
Description
Approving Change Order #2 to Contract Downtown Streetscape Proj
AGENDA - Date
9/9/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Change Order # 2 Summary <br />Sidewalk Extensions on N.E., S.E., and S.W. Corners <br />City of Paris <br />Downtown Streetscape Project <br />Federal #STP 2000 (615) TE and CSJ #0901-29-107 <br />August 30, 2004 <br /> <br /> Sidewalk EJ :tensions on <br /> N.E., S.E., ant S.W. Corners <br /> estimated Unit Total <br />Item Description Quantity Price Price <br />1 Mobilization (6% of change order work) 1 lS 8,300.00 8,300.00 <br />2 Remove concrete curb 1,069 LF 5.00 5,345.00 <br />3a Remove and dispose of concrete sidewalk, siGns, etc. 9,035 SF 1.10 9,938.50 <br />3b Remove by hand and dispose of concrete at buildings 0 SF 1.75 0.00 <br />4 Replacement sidewalk 9,320 SF 5.44 50,700.80 <br />5 Asphalt street repair 1,069 SF 5.00 5,345.00 <br />6 Textured asphalt crosswalks 0 SF 9.00 0.00 <br />7 Type "A" concrete curb ramp OEA 500.00 0.00 <br />8 Type "8" concrete curb ramp OEA 500.00 0.00 <br />9 Type "C" concrete curb ramp OEA 500.00 0.00 <br />10 Type "0" concrete curb ramp OEA 500.00 0.00 <br />11 Concrete curb ramp (non-standard size) 1 EA 1,000.00 1,000.00 <br />12 Detectable warner pavers in curb ramps 25 SF 8.00 200.00 <br />13 Elevated sidewalk with handrails 129 EA 16.00 2,064.00 <br />14 Elevated sidewalk with handrails over basement area 120 EA 20.00 2,400.00 <br />15 Remove and disPose of indoor/outdoor carpet (Area 1) 650 SF 2.00 1,300.00 <br />16 Sandblasting existing sidewalk prior to resuñacing 650 SF 4.00 2,600.00 <br />17a Resuñacing existing sidewalk (Area 1) 1084 SF 5.00 5,420.00 <br />17b Resuñacina existina sidewalk (Area 1) 0 SF 5.00 0.00 <br />18 Resuñacing existing sidewalk at buildings 0 SF 10.00 0.00 <br />19 Shallow trench drain 0 LF 30.00 0.00 <br />20 General DurDose trench drain 190 LF 40.00 7,600.00 <br />21 Glass paver replacement 0 SF 150.00 0.00 <br />22 Electrical (12 lightS)* 1 LS 44,600.00 44,600.00 <br />23 Sianaae 0 LS 15,000.00 0.00 <br />24 Traffic handline 0 LS 3,000.00 0.00 <br /> TOTAL $146,813.30 <br /> <br />. City will purchase lights & contractor shall install including, all bases, bores, conduit. wiring, & required appurtenances. <br /> <br />EXHIBIT A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.