My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-PRELIM AND FINAL PLAT OF 1.033 ACRES ON WEST SIDE OF 600 BLOCK OF NE 25TH ST
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
01 January
>
01.09.12
>
09-PRELIM AND FINAL PLAT OF 1.033 ACRES ON WEST SIDE OF 600 BLOCK OF NE 25TH ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 4:00:51 PM
Creation date
1/6/2012 10:56:30 AM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br />TO: Mayor and City Council <br />Planning and Zoning Coinmission <br />FROM: Shawn Napier, <br />Director of En 'ng, Planning and Development <br />DATE: December 21, 2011 <br />SUBJECT: Water Tower Place CB 258 Final Plat <br />1 have reviewed the final plat of the above referenced addition. It appears that the final plat <br />complies with the City of Paris subdivision regulations with the following exceptions. <br />1. The Point of Beginning (POB) should be moved from the NE corner to the SE corner. <br />2. Label the Right-of-Way width for Tudor St. <br />3. Show the front setback at 25-feet. <br />1 recommend approval of the final plat upon submission of a corrected mylar copy with <br />signatures of the surveyor and owner prior to noon on January 6, 2012, <br />cc: Gene Anderson, Interim City Manager <br />Brandon Chaney, P.E., R.P.L.S., Chaney Engineering Inc. <br />Richard B. Rooney <br />5C) <br />
The URL can be used to link to this page
Your browser does not support the video tag.