My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05 Lake Crook
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2005
>
01 January
>
2005 01-20
>
05 Lake Crook
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2005 11:15:09 AM
Creation date
1/14/2005 6:53:56 AM
Metadata
Fields
Template:
AGENDA
Item Number
05 Lake Crook
AGENDA - Type
MISCELLANEOUS
Description
Lake Crook Development Study
AGENDA - Date
1/20/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, . <br /> <br />," <br /> <br />~ of Paris <br /> <br />Stud~ of Lake Crook <br /> <br />March, 2001 <br /> <br />, <br />, <br /> <br />In developing land plans for this study, the <br />consultant assumed no encroachment <br />would be made into the flood plains or <br />}vetlands su"ounding Lake Crook. <br /> <br />1.5.4 Texas Department of Health. The Texas Department of Health regulates on-site sewage <br />disposal in Texas. These would include septic and aerobic systems under 10,000 gallons per day <br />with either absorption fields, spray surface irrigation, or evapotranspiration fields. The state <br />regulations require that homes built within 300 feet of a public sewerage system must connect to <br />that system. If septic or aerobic systems are to be used for on-site disposal, the lots on which <br />these homes are built must usually be at least Y2-acre in size. However, special orders by the <br />Texas Water Quality Board (now the Texas Natural Resource Conservation Commission) dating <br />back to 1971 dictates that within the Lake Crook watershed, minimum lot sizes within a <br />subdivision must be I-acre or more to use anyon-site disposal system. Ifless than I-acre lots are <br />platted, a community sewer system must be installed. <br /> <br />1.5.5 National Pollution Discharge Elimination System (NPDES). The prevention of storm <br />\vater runoff laden with silt and sediments into the nations streams and waterways is a priority of <br />the Environmental Protection Agency. The disturbance ofas little as Y2-acre requires preparation <br />of a Storm Water Pollution Prevention Plan (SW3P) to prevent soil runoff and filing of a Notice <br />of Intent (NO I) to begin construction. The creation of a subdivision or the construction of a <br />soccer field equally fall under the umbrella of this law, Obviously, with the turbidity of Lake <br />Crook as high as it is, compliance with this law will be a major local enforcement issue as well <br />as federal as the city attempts to keep the lake from being further muddied. <br /> <br />Page 9 of 45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.