Laserfiche WebLink
4. BIDDER will complete the Work for the following price(s); <br />BID SCHEDULE <br />ESTIMATED <br />NO. DESCRIPTION QUANTITY <br />1. Mobilization. 1 LS <br />Water System Improvements: <br />2. 8" C-900 DR-18 PVC waterline, <br />installed, tested, complete. <br />3. 6" C-900 DR-1$ PVC waterline, <br />installed, tested, complete. <br />4. 4" C-900 DR-18 PVC waterline, <br />installed, tested, complete. <br />5. 2" Schedule 80 PVC. <br />6. 8" x 6" Tapping sleeve and valve with <br />box and pad, installed, complete. <br />7. 6" Tapping sleeve and valve with box <br />and pad, installed, complete. <br />8. 4" Tapping sleeve and valve with box <br />and pad, installed, complete. <br />9. 6" Gate valve with box and pad, <br />installed, complete. <br />10. Fire hydrant. <br />11. Remove fire hydrant. <br />12. Ductile iron fittings. <br />13. 6" Bore no encasement. <br />14. Asphalt street paving. <br />35 LF <br />2,931 LF <br />UNIT TOTAL <br />PRICE PRICE <br />$ $ <br />$ $ <br />$ $ <br />10 LF <br />$ <br />$ <br />20 LF <br />$ <br />$ <br />1 EA <br />$ <br />$ <br />2 EA <br />$ <br />$ <br />1 EA <br />$ <br />$ <br />10 EA <br />$ <br />$ <br />5 EA <br />$ <br />$ <br />2 EA <br />$ <br />$ <br />0.302 'I'N <br />$ <br />$ <br />40 LF <br />$ <br />$ <br />3,313 LF <br />$ <br />$ <br />13 <br />- , 11s <br />