Laserfiche WebLink
<br /> <br />MEMORANDUM <br /> <br />To: <br /> <br />Tony Williams, City Manager <br /> <br />Shawn Napier, Interim Public Works Di~~ <br /> <br />Bid Tabulation and Recommendation <br /> <br />From: <br /> <br />Subject: <br /> <br />Date: <br /> <br />February 9, 2005 <br /> <br />The following bids were received at a bid opening on Tuesday, February 8, 2005 at <br />3 p.m., for Flexible Base Material (Red Rock). <br /> <br />1.) Martin Marietta Materials <br />PO Box 219 <br />Powderly, Texas 75473 <br /> <br />.$7.65 per ton <br /> <br />2.) Smith Crushed Stone, L.P. <br />PO Box 1139 <br />Paris, Texas 75461 <br /> <br />~ per ton <br /> <br />3.) Jackie Wheeler Construction <br />Route 6 Box 6620 <br />Paris, Texas 75462 <br /> <br />.$9.00 per ton <br /> <br />I am recommending the low bid of $7.65 per ton from Martin Marietta Materials <br />be accepted for Flexible Base Material (Red Rock). <br /> <br />These funds are budgeted in 2004-2005. <br /> <br />/as <br />