Laserfiche WebLink
<br />.J <br /> Project Budget <br /> Police and Courts Facility <br /> City of Paris <br /> 3/8/05 <br /> 11/07/03 02/18/05 03/08/05 <br />Site Acquisition <br />Land Cost 1,275,000 1,275,000 1,275,000 <br />Site Assessment 0 0 0 <br />Closing Costs 0 0 0 <br />Testing Services <br />Subsurface Soils 18,250 18,250 18,250 <br />Construction Materials 10,000 10,000 10,000 <br />Construction <br />Building 3,674,031 3,865,935 3,892,135 Note G <br />Existing Site Utilities Relocation 0 0 0 <br />Landscape 10,000 0 0 <br />Contingency 150,000 100,000 100,000 <br />FF&E <br />Furniture 270,000 270,000 270,000 Note E <br />AV Equipment 41,904 0 0 Note E <br />Communications Tower 0 0 0 <br />Police Lab Equipment 0 0 0 <br />City Budgets <br />Asbestos Abatement 40,663 40,663 40,663 <br />Site Survey 8,033 8,033 8,033 <br />Telephone ' 50,000 50,000 40,000 Note F <br />IT Cabling/Backbone 70,000 0 0 <br />Moving Costs 2,000 2,000 2,000 <br />Communications Relocation 0 0 0 <br />Bond Interest 0 0 0 <br />Site Paving Materials Allowance 20,000 0 0 Note D <br />Project Contingency 0 0 0 <br />Indirect Costs <br />AlE Basic Services 338,000 338,000 338,000 <br />Cost Estimating 10,800 10,800 10,800 <br />Civil Engineering 36,000 36,000 24,600 Note B <br />Landscape Design 4,400 4,400 3,600 Note B <br />AN /Acoustical Engineer 20,500 20,500 20,500 <br />ADA Consultant 3,750 3,750 3,750 <br />Structural Engineering 14,700 14,700 14,700 <br />Technology Consultant 13,000 13,000 13,000 <br />Interior Design & Furniture Selection 38,000 38,000 38,000 <br />As-Builts (existing) 4,000 4,000 0 Note C <br />Reimbursable (Budget Only) 38,000 38,000 38,000 <br /> <br />Total Project Budget <br /> <br />6,161,031 <br /> <br />6,161,031 <br /> <br />6,161,031 <br /> <br />Note A <br /> <br />Note A: <br />Note B: <br />Note C: <br />Note D: <br />Note E: <br />Note F: <br />Note G: <br /> <br />Total project budget includes $161,031 in bond interest accrual as of 1117/2003. <br />City to perform C.A portion of civil & landscape services. <br />As-builts deleted from AlE contract. <br />Site paving materials allowance moved to construction budget. <br />AIV equipment included in construction budget. <br />Final contract cost from City <br />Add $10,000 from telephone budget, $11,400 from civil engineering, $800 from landscape <br />design, $4,000 AlE as-builts. <br />