Laserfiche WebLink
5. BIDDER agrees that the Work will be substantially completed and ready for fmal <br />payment within 105 calendar days after the date when the Contract Time commences to <br />run, as provided in the General Conditions. <br />BIDDER accepts the provisions of the Agreement as to $115 per calendar day liquidated <br />damages in the event of failure to complete the Work on time. <br />6. The following documents aze attached to and made a condition of this BiD: <br />(a) Required Bid Security in the form of <br />7. Communications concerning this Bid shall be addressed to the address of BIDDER <br />indicated below. <br />8. The terms in this Bid, which are defined in the General Conditions of the Construction <br />Contract, included as part of the Contract Documents have the meanings assigned to them <br />in the General Conditions. <br />SUBMITTED on <br />Of the above total - Base Bid, $ <br />incorporated in the Work, and <br />$ <br />20 <br />is for materials actually <br />is for all other costs. <br />18 <br />- - 57 <br />