My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
28.Hangar lease assignment from Bill Boothe
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
02 February
>
02.27.12
>
28.Hangar lease assignment from Bill Boothe
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2012 6:18:13 PM
Creation date
2/24/2012 6:18:12 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
28
Doc Type
Agenda
CITY CLERK - Date
2/27/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> ~Pu Vt <br /> <br /> J 9 <br /> G1 N <br /> IgQB <br /> <br /> arm 0 ;a 0 <br /> <br /> <br /> Commercial Plan Review Comments <br /> PARIS, TX <br /> <br /> PLAN REVIEW APPROVED YES REVISIONS PENDING SEE BELOW <br /> BV PROJECT # 2009-002789 <br /> <br /> PROJECT Aircraft Hangar <br /> ADDRESS 6780 Collier Drive <br /> <br /> DATE 511212009 PLAN REVIEWER Ken Huston <br /> PROJECT DESCRIPTION Metal Building <br /> THIS DOES NOT INCLUDE ANY ZONING, SITE PLAN REVIEWS, REQUIRED SETBACKS, PUBLIC WORKS, PARKING, DRIVES AND APPROACHES, HEALTH, <br /> OTHER BUILDING CODE REVIEWS, FLOOD PLAIN ISSUES, LANDSCAPING REVIEWS, PHOTOMETRIC SITE PLAN REVIEWS, SIGNAGE, ETC. <br /> "Texas Liquor Licensing and permits required through TABC & City" <br /> <br /> NO AMENDMENTS <br /> BUILDING DATA <br /> TDLR-AB Registration # - Provided EABPRJA NOT REQUIRED < $50,000 <br /> Ener Compliance Report - Provided NO <br /> Use Hangar <br /> Occupancy Classification S-2 <br /> Construction Type - Minimum II-B <br /> Fire Wall - Required NO <br /> Roof Type Minimum - Required B <br /> Number of Stories ONE <br /> Building Floor Area & Occupant Load Floor SF OL <br /> 1st 2000 4 <br /> Total = 2000 4 <br /> Fire Alarm NO <br /> Automatic Fire Sprinkler System NO GROUP III NOT REQUIRED NFPA409 <br /> Corridor Rating - Required NIA <br /> Attic Draft-stops - Required NO <br /> Exterior Walls Rated/Protected - Required NO <br /> Fire Separation Distance <br /> Fire Barriers Fire Areas/Occ. Se - Required NO <br /> Incidental Uses/Fire Barriers - Required NO <br /> Non-Sprinklered: 45-minute rated doors, self-closing or automatic- <br /> closing. Duct penetrationlopenings require fire dampers. <br /> Incidental Uses/Smoke Barriers - Required NO <br /> Fire Sprinklered: Doors self-closing or automatic-closing upon <br /> detection of smoke. Duct penetration/openings require smoke dampers, <br /> Post Room Capacity Signage near main exit. NIA <br /> "Maximum Occupant Load: xxx " <br /> Maximum Common Path of Egress Travel 75' <br /> r=, is <br /> 1000 Jupiter Road EX HI Eg71 T' ~ Main: (800) 906-7199 <br /> Swte 800 f l L ! Fax: (800) 910-8284 <br /> Plano, TX 75074 2 3 www.BVbuildingsafety.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.