Laserfiche WebLink
In the event the Base Bid project exceeds budget, the OWNER reserves the <br />h <br />right to remove by the <br />Deductive Alternate below the I1 r <br />and Dickson Street Water and Sewer work as shown on Pa <br />e <br />2 of the Plans. <br />g <br />DEDUCTIVE ALTERNATES. <br />ESTIMA.TED IJNIT <br />TOTAL <br />NO. DESCRIPTION <br />QUANTTTy pRICE <br />PRICE <br />Water System Improvements: <br />1. 6" C-900 DR-18 PVC waterline <br />, <br />installed, tested, complete. <br />902 LF $ <br />$ <br />2. 4" C-900 DR-18 PVC waterline, <br />installed, tested, complete. <br />10 LF $ <br />$ <br />3. 6" Tapping sleeve and valve with box <br />and pad, installed, complete. <br />1 EA $ <br />$ <br />4. 4" Tapping sleeve and va1ve with box <br />and pad, installed, complete. <br />1 EA $ <br />$ <br />5. 6" Gate valve with box and pad, <br />installed, complete. <br />6 EA $ <br />g <br />6. Fire hydrant. <br />3 EA $ <br />$ <br />7. Remove fire hydrant. <br />1 EA $ <br />$ <br />8. Ductile iron fittings. <br />0.204 TN $ <br />~ <br />9. Asphalt street paving. <br />1,294 LF $ <br />~ <br />10. Asphalt street repair, i.ncluding <br />saw-cut both sides of trench, <br />base, installed. <br />20 LF $ <br />$ <br />11. Gravel drive repair. <br />19 LF $ <br />$ <br />12. Concrete street repair. <br />54 SY $ <br />$ <br />16 <br />