Laserfiche WebLink
5. BIDDER agrees that the Work will be substantially completed and ready for finai <br />payrnent within 105 calendar days after the date when the Contract Time commences to <br />run, as provided in the General Conditions. <br />BIDDER accepts the provisions of the Agreement as to $115 per calendar day liquidated <br />damages in the event of failure to complete the Work on time. <br />6. The following documents aze attached to and made a condition of this BID: <br />(a) Required Bid Security in the form of <br />7. Communicatiotts concerning this Bid sha11 be addressed to the address of BIDDER <br />indicated below. <br />8. The terms in this Bid, which are defined in the General Conditions of the Construction <br />Contrract, included as part of the Contract Documents have the meanings assigned to them <br />in the General Conditions. <br />SUBMTTTED on 20 <br />Of the above total - Base Bid, $ is for materials actually <br />incorporated in the Work, and $ is for all other costs, <br />18 <br />