My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-DELIBERATE/ACT ON RESOLUTION ACCEPTING BID AND AWARDING CONTRACT FOR RECONSTRUCTION OF SIDEWALKS AND PLACING CONDUIT ON CLARKSVILLE STREET TO BOBBY SMALLWOOD CONSTRUCTION CO
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
03 March
>
03.12.12
>
11-DELIBERATE/ACT ON RESOLUTION ACCEPTING BID AND AWARDING CONTRACT FOR RECONSTRUCTION OF SIDEWALKS AND PLACING CONDUIT ON CLARKSVILLE STREET TO BOBBY SMALLWOOD CONSTRUCTION CO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 3:49:31 PM
Creation date
3/9/2012 2:09:56 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL AGENDA ITEM BRIEFING SHEET <br />Submittal Date: <br />Originating Department: <br />Presented By: <br />Agenda Item No.: <br />03-02-2012 <br />Engineering, Planning & <br />Shawn Napier, P.E. Director of <br />Council Date: <br />Development <br />Engineering, Planning & <br />11. <br />03-12-2012 <br />Development <br />RECOMMENDED MOTION: <br />Deliberate and act on a resolution accepting the bid and awarding the contract for the reconstruction of <br />sidewalks and placing conduit for utilities to be placed underground on Clarksville Street to Bobby <br />Smallwood Construction Co. Inc., in the amount of $237,006.62; authorizing the City Manager to <br />negotiate and execute all necessary documents. <br />POLICY ISSUE(S): <br />Sidewalk and Utility relocation <br />BACKGROUND: <br />Bids have been received for the Sidewalk project and utility relocation. The low bidder was Bobby <br />Smallwood Construction. His bid for the Sidewalk replacement was $186,875.72 and $50,130.90 for <br />the additional work of placing the underground utility infrastructure. The Original bid must be awarded <br />as submitted because of the $150,000 grant the City received. A change order will be submitted at the <br />March 26t'' City Council meeting that will reduce the base bid of $186,875.72 to $169,396.47. The two <br />major bid items involve changing out the type of sidewalk drains and not resurfacing two areas of <br />concrete over basements. The shortfall far the base bid is $38,443.87 and $100,637.07 for the overall <br />proj ect. <br />The City will need to go through the cost recovery process with ONCOR in order to get the electrical <br />portion completed. The City has included the "civil work" in our bid for ONCOR and Suddenlink. <br />Other estimated fees include: the transfer of electric services from weather heads to underground lines <br />and replacing the meter bases that are not up to code -$8,800.00, The fee for Suddenlink to install cable <br />into the PVC -$1,262.30, Cost for additional easements (surveyor) and bollards around pad mounted <br />transformers - cost will primarily depend on easement acquisition. The light poles for the project cost <br />$17,406.40. <br />BOARD/ COMMISSION RECOMMENDATION: <br />EXHIBITS: <br />Resolution, bid tab <br />ACTION: <br />BUDGET INFO: <br />❑ Financial Report ❑ Minute Order <br />Expense <br />$237,006.62 <br />❑ Department Report Z Resolution <br />Budgeted Amt. <br />$45 <br />000 <br />00 <br />, <br />. <br />❑ Presentation ❑ Ordinance <br />YTD Actual <br />$13 <br />891 <br />00 <br />❑ <br />, <br />. <br />Public Hearing ❑ Other <br />Acct. Name <br />Downtown Sidewalk Replacement <br />Acct. Number <br />25-0351-40-00 <br />FISCAL NOTES: <br />REVIEWED AND APPROVED BY: <br />E Administration Z Ciry Clerk [I Eng. Planning & Development ❑ EMS/IT ❑ Finance ❑ Fite <br />❑ Municipal Court ❑ Legal ❑ Library ❑ Police ❑ Public Works ❑ Utilities <br />City of Paris 067 Revised 2/04/08 <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.