Laserfiche WebLink
<br />FT-o,,,: RECEIVED <br />(Address) MAR 13 2011 <br />ze~ (Address) CITY MANAGER <br />PARIS, TEXAS <br />Re: April 1, 2012 through March 31, 2013 Demolition and construction of Curb/Gutter, <br />Driveway Approaches and Reinforced Concrete Sidewalk. <br />Pursuant to and in coinpliance with your bid specifications for the deinolition and construction of <br />Cw•b/Gutter, Driveway Approaches and Reinfoi•ced Concrete Sidewalk, we bid the following: <br />• Please submit all bids in unit prices not luinp sum per the estimated quantities provided. <br />~ 0 4=- <br />re►- foot for typical curb and gutter installation (city standard) <br />4500 L.F. <br />S -(D C~ Remova] and Disposal per L.F. <br />C~ Total price for 6" typical curb and gutter (sum of the other two prices) <br />, per foot for curb and gutter to match existing curb style installed <br />(ie. WPA style curb) 50 L.F. <br />$_Q . IRemoval and Disposal per L.F <br />Total price for WPA curb and gutter (sum of other two prices) <br />per square foot for the standard residential driveway approach installation <br />(city standard) 4000 S.F. <br />$ C% Removal and Disposal per S.F. <br />$ Total price for driveway appi-oach (suin of the other two prices) <br />$ per square foot for i-einforced concrete sidewalk (city standard) <br />2500 S.F. <br />$ C v Removal and Disposa) per S.F. <br />$ (sy„ e'1 vl Total price for sidewalk replacement (sum of other two prices) <br />$ S ; '3~ per foot for Concrete Valley Gutters 200 S.F. <br />$ a Removal and Disposal per S.F. <br />$ Total price for Concrete Valley Gutters (sum of the other two prices) <br />BY " <br /> <br />Title: <br />4 ~j~~~~ `o_ <br />~ rk ~ <br />Dated the ~ of ~1 1_ , 2012. <br />k ( <br />J <br />EXHIBIT-~ ~ 4 4 <br />