Laserfiche WebLink
Fro,n: RECEIVED <br />(Address) MAR 13 2011 <br />(Address) CI~ MANAGER <br />PS, TFXAS <br />Re: April l, 2012 through March 31, 2013 Demolition and construction of Curb/Gutter, <br />Driveway Approaches and Reinforced Concrete Sidewalk. <br />Pursuant to and in compliance with your bid specifications for the demolition and construction of <br />Cui•b/Gutter, Driveway Approaches and Reinforced Concrete Sidewalk, we bid the following: <br />• Please submit all bids in unit prices not lump sum per the estimated quantities provided. <br />. <br />$ ~ per foot for typical curb and gutter installation (city standard) <br />4500 L.F. <br />$_~)-.(D C-. Removal and Disposal per L.F. <br />$~7` • C~c: Total price for 6" typica] curb and gutter (sum of the other two prices) <br />$per foot for curb and gutter to match existing curb style installed <br />(ie. WPA style curb) 50 L.F. <br />$ Removal and Disposal per L.F. <br />$ C(~ ~~j Total price for WPA curb and gutter (sum of other two prices) <br />$ tw> per square foot for the standard residential driveway approach installation <br />(city standard) 4000 S.F. <br />$ •6 G Remova] and Disposal per S.F. <br />-_7 •:3 f? <br />Total price for driveway approach (sum of the other two prices) <br />$ per square foot for reinforced concrete sidewalk (city standard) <br />2500 S.F. <br />$ ~ v Removal and Disposal per S.F. <br />Total price for sidewalk replacement (sum of other two prices) <br />$ SE'3~ per foot for Concrete Valley Gutters 200 S.F. <br />$ ~ Removal and Disposal per S.F. <br />~ <br />$ Total price for Concrete Valley Gutters (sum of the other two prices) <br />1k.;"P By jlv``'-4 Title: <br />Dated the of ~12,~TK' ,2012 <br />~ <br />` ExHIBiT <br />