My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20-AUTHORIZE CITY MANAGER TO NEGOTIATE A CONTRACT WITH HAYTER ENG FOR $53,000 FOR REHABILITATION STUDY OF TRAIL DE PARIS
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
04 April
>
04.23.12
>
20-AUTHORIZE CITY MANAGER TO NEGOTIATE A CONTRACT WITH HAYTER ENG FOR $53,000 FOR REHABILITATION STUDY OF TRAIL DE PARIS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 3:46:46 PM
Creation date
4/20/2012 5:46:26 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.63 Geotechnical Investigation - ENGINEER will arrange for geotechnical studies of the <br />project site as required. <br />2.6.4 Construction Review - ENGINEER will provide services as requested by City during <br />conshuction. <br />2.6.5 Phase 2 Design Plans - ENGINEER will provide plans and specifications for Phase 2 <br />design. Said plans and specifications will be based on project scope after completion of <br />the Rehabilitation Study. <br />2.6.7 SW3P - ENGINEER will prepare a Stormwater Pollution Prevention Plan as required for <br />project construction. <br />9 <br />210 <br />
The URL can be used to link to this page
Your browser does not support the video tag.