My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20-AUTHORIZE CITY MANAGER TO NEGOTIATE A CONTRACT WITH HAYTER ENG FOR $53,000 FOR REHABILITATION STUDY OF TRAIL DE PARIS
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
04 April
>
04.23.12
>
20-AUTHORIZE CITY MANAGER TO NEGOTIATE A CONTRACT WITH HAYTER ENG FOR $53,000 FOR REHABILITATION STUDY OF TRAIL DE PARIS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 3:46:46 PM
Creation date
4/20/2012 5:46:26 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C <br />SCOPE <br />• Rehabilitation Study <br />o Initial scoping meeting <br />0 8egin geotechnical investiqation <br />o Research co»struction history and avarlab/e plans or supporting <br />information <br />o Perform conditlon analysis survey <br />■ Photograph typital defects <br />~ 100' pavemenr defett survey <br />■ cotalog cut/ft/1 sections, tree canopy,age,width, pvmt section,etc <br />o Analysis of dafa collected- use FEMA f/ows and hydraulics <br />o Meeting w city staff ro eva/uate data collected <br />o Research rehab options-pavement <br />o Research rehab options- drainage <br />o Cost estimates for ap to 2 pavement opCians and 2 drainage options. <br />o Draft final report <br />o Presentation meeting. <br />• Phase 2 Design-12`h to Collegiote Drive and Loop 286 to Paris/Reno City Limits <br />o Topo and plot fietd data <br />o Paving rehab design calculations and drawings <br />o Drafnage rehab design calculations and drawings (minor rehab) <br />o Stormwater Pollutian Prevention Pfan <br />o Compliance with natfonwide 404 permit- no pre const notifrcatioa <br />o Draft specifications and bid documents <br />o Canstruction document review meeting <br />o Advertise for constructlon bids <br />o Engineering oversiqht during construction <br />• Phase 2 Design- Collegiate Drive to Laop 286 <br />(Begin pre-construction coordination with Corps for phase 2 droinage) <br />o Topo and plotfield daia <br />o Paving rehab desiyn calculations and drawings <br />o Drainage relrab design calculations and drawings (minor & major <br />rehab) <br />o Stormwater Pollution Prevention P/an <br />o Comptiance with nationwide 404 permit includinq pre app coordination <br />meeting and pre-constructlort notificatian <br />o D%ft specifications and bid dacuments <br />o Construction document review meetrng <br />o Advertise for construction bids <br />o Engineering oversight during construction <br />212 <br />
The URL can be used to link to this page
Your browser does not support the video tag.