My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
16-AUTHORIZE CITY MANAGER TO NEGOTIATE CONTRACT WITH HAYTER ENG IN AMOUNT OF $20,400
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
05 May
>
05.14.12
>
16-AUTHORIZE CITY MANAGER TO NEGOTIATE CONTRACT WITH HAYTER ENG IN AMOUNT OF $20,400
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 3:20:55 PM
Creation date
5/11/2012 4:24:52 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HAYTER <br />ENGINEERING, INC <br />CONSUITANTS PLANNERS ENGINEERS <br />Mr. Ron Sullivan, P.E. <br />Director of Public Works <br />City of Paris <br />P.O. Box 9037 <br />Paris, TX 75461 <br />Re: Embankment Failure - Trail de Paris <br />Dear Ron: <br />4445 S.E. LOOP 286 <br />PARIS, TEXAS 75460 <br />(903) 785-0303 <br />FAX (903) 785-0308 <br />Apri( 27, 2012 <br />Via E-mail: rsullivan a,paristexas.gov <br />Following our visit ta the Trail yesterday and instructions from the Council Monday night, we have <br />prepared a proposal for engineering service to correct the embankment failure along the south side of the <br />Trail de Paris, which is generally located on the south side of the Trail south of Golden Acres Retirement <br />Community. We will obtain a geotechnical consultant to perform borings and studies necessary to <br />determine the slope stability, bearing capacity, and other relevant parameters for design. We will do the <br />topographica) surveying necessary to lay out the eYtent and shape of the existing failure. We will anatyze <br />two (2) preliminary repair concepts and prepare comparative cost estimates and we will design the <br />selective alternativc. Our fee includes preliminary coordination with the US Army Corps of Engineers to <br />determine their involvement in the project. If a full preconstruction notice for a Nationwide Permit <br />becomes necessary or if an individual permit is required we will provide these services at the additional <br />hourly rates contained in Appendix A of our contract. <br />For your information 1 have prepared a preliminary estimate of construetion costs based upon gabions, <br />without extensive additional Corps requirements, of $150,000. A kcy element for the project will be the <br />contractor's ability to access the site and stage construction operations. If we could locate and provide to <br />the contractor a work area near the project it could 6e very beneficial for project costs. <br />We are prepared to begin immediately upoii your authorization and will complete the project as promptly <br />as possible corresponding to the level of coardination which may be required with the Carps. Our fee for <br />the above services would be: <br />• Geotechnical Studies $8,000 <br />~ Surveying, Engineering Design, and Preliminary Coordination $12,400 <br />TOTAL $20,400 <br />We appreciate this opportunity to be of service to the City of Paris. <br />Sincerely, <br />AYT ENGINEERING, INC. <br />111 <br />! <br />R. Reevei Haytet,, P.E. <br />President' <br />A <br />EXHIBI"3' "KI~ <br />Service Sriice 1957 <br />TBPE F-000315 <br />- 49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.