Laserfiche WebLink
A. All work must be done by skilled mechanics and must be uniform in appearame, of approved <br />color, smooth ancl free from r~, sags, Skips, and defective brushing. <br />Paint must be well mixed, not settkd, badly caked, or thickened in container. It must be <br />broken up with a paddte to a smooth cunsistency and have easy brushing pr ~~~y <br />operties. <br />C. Paint must be readily mixed. <br />D. Installation rate must be no higher than the manu~~tUT&s 9uggested rate of coverage. All paint <br />materials must be delivered in originai unopened containers, with labels and tag incact. <br />E. Paint must be allowed to dry hard betweEn coats, as per manufacturer's recommendation. Full <br />coveaage is tequired. <br />F. When color, wood grain, staiin, or undercoat show through the final coat of paint, the µ,ork must be <br />covered by additional coats until the paint is uruform in color and appeamnce and ~vemge is <br />completed. <br />G. Ma1ce edges of paint adjoining other materials or colors <br />sharp and ciean without overlapping. <br />H. All cracks and joints must be completely sealed with caulking compound <br />exterior). Caulking compound must be delivored to the job in manufacturer's u openedand <br />containers. <br />I• Hardware, accsssorics, and fixtures must be removed end protacted dur;ng painting and replaced <br />afterwards. <br />J. All work must be protected from dae¢e by use of drop cloths. <br />K. SprRY Painting is allowed only where indicatcd by individual speci6cations. <br />L• Ai completion of ail construction of the job, a(1 damaged surfaces must be touched up and left in <br />first class condition. <br />M. Contractor must pr+ovide color satpplss for the homeowner's approva[. <br />19.3. LEAD BASE ppINT MUST NOT BE SED. <br />19.4. Methods <br />19.5. Exterior Painting <br />A. Exterior painting must ba performod when weather conditions are scceptable as reccommended by <br />the manufacturer. Back prime re <br />retardant. Naif holes, splits, or sc~tcho~s rauwood st be i~t°ne coat of primer paint with mildew <br />coat Knots and pitch streaks must be spot primed with a q~tal ty stain~~'I~r w~ ~ after prime <br />have smooth finished surface when paintod. urfaces must <br />19.6. Interior painting <br />A. Wa11s and ceiling ataincd by water must be treated with a quality stain killer prior W painqng. At <br />no time will latex paint be used to cover oil base pa;nt. All trim and wood must t+eceive two coats <br />of semi-gloss oil base enamel paint. <br />19•7• Porch and Floor Enamel <br />TDHCA - HOME Investment partnenhIPs progam <br />Nppendiz A-04 -'IMC Spocifications Page 20 of 24 <br />Revised 0 11o1 ,2004 <br />V- ~ 231 <br />