My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25-REHABILITATION OF THE EAST ELEVATED STORAGE TANK
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
05 May
>
05.14.12
>
25-REHABILITATION OF THE EAST ELEVATED STORAGE TANK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 3:29:04 PM
Creation date
5/11/2012 6:34:32 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Blast cleaning operations shall be done in such manner that no damage is done to <br />partially or entirely completed portions of the work. <br />Dry blast cleaning operations shall not be conducted on surfaces that will be wet after <br />blasting and before painting, or when ambient conditions are such that any visible <br />rusting occurs before painting or coating. <br />If any rust forms after blast cleaning, the surface shall be re-blasted before painting. <br />The blast cleaned surface shall be examined for any traces of oil, grease, or smudges. If <br />present, they shall be removed as outlined in Specification SSPC-SP 1-63, "Solvent <br />Cleaning". <br />The height of profile of the anchor pattern produced on the surface shall be limited to a <br />maximum height that will not be detrimental to the life of the paint film. The maximum <br />particle sizes specified in paragraphs 1 to 7 may produce an anchor pattern that is too <br />high or too rough for the paint system to be used. In such cases the abrasive sizes <br />should be reduced. If the application of the second coat of paint is deferred, an <br />adequate reduction in anchor pattern depth shall be made. <br />The blast cleaned surface should be further treated or primed, as specified in the <br />agreement covering the work, preferable within 24 hours after blast cleaning when <br />practicable, but in any event before any visible or detrimental rusting occurs. <br />Where chemical contamination of the surface may occur, the steel should be painted as <br />soon as possible after blast cleaning. <br />2.04 SAFETY PRECAUTIONS <br />If fire or explosion hazards are present, proper precautions shall be taken before any <br />work is done. If the structure previously contained flammable materials, it shall be <br />purged of dangerous concentrations. <br />Nozzle blast operators exposed to blast dust shall wear a U. S. Bureau of Mines <br />approved helmet connected to a source of clean, compressed air. <br />Ts2-3.. 44'7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.