My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25-REHABILITATION OF THE EAST ELEVATED STORAGE TANK
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
05 May
>
05.14.12
>
25-REHABILITATION OF THE EAST ELEVATED STORAGE TANK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 3:29:04 PM
Creation date
5/11/2012 6:34:32 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Notes: <br />1. All concrete work shall be in accordance with <br />ACI 318. <br />2. All concrete shall have a minimum 28 day <br />compressive strength of 3,000 psi. <br />8,'0" <br />~ <br />i I <br />S <br />I I ~ I <br />I I <br />I ~ ( <br />i lo,o <br />F o <br />; <br /> <br />~ <br />PIAN VIEW <br />, a <br />f ° <br />~ N <br />i <br />i_illEl(I-1lI;i~ <br />6„ 4' . 4A fi. <br />~_-,lil ~11l~~~t <br /> <br />SEC i ION viEW <br />14 BARS <br />~ AT BQT10M, CONT. <br />0 <br />Spiash Pad <br />► U N H A I <br />NGINEERIN <br />#a saRs <br />AT 12" O.C.E.W. <br />482 <br />
The URL can be used to link to this page
Your browser does not support the video tag.