My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25-REHABILITATION OF THE EAST ELEVATED STORAGE TANK
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
05 May
>
05.14.12
>
25-REHABILITATION OF THE EAST ELEVATED STORAGE TANK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 3:29:04 PM
Creation date
5/11/2012 6:34:32 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SSPC-Guide 6 <br />October 1, 2004 <br />Containment <br />Classification <br />Class 1 W <br />Class 2W <br />Class 3W <br />Class 4W <br />TABLE W - WATER BLASTING/WATERJETTING* <br />COMBINATIONS OF CONTAINMENT AND VENTILATION SYSTEM COMPONENTS <br />Containment System <br />Ventilation (5.4 of SS <br />PC-Guide 6 <br />) <br />5.3.1 <br />2 <br />3 <br />5 <br />5.3.3 <br />5.3.4 <br />5.3.5 <br />5.4.1 <br />Air <br />P~ <br />5.4.3 - Air <br />5Air <br />5.4.5 <br />ExhaUSt <br />Containme <br />. <br />. <br />Penetrability <br />Su <br />PPort <br />Structure <br />Joints <br />Entryway <br />Make- <br />I <br />t <br />Air Flow <br />Pressure <br />Movement <br />Dust <br />Filtration <br />nt Materials <br />U <br />P <br />B1- Air <br />C1- <br />G1 - <br />A1 - Rigid <br />Impenetrable <br />Rigid <br />D1- <br />F2 - <br />Forced <br />H2 -Visual <br />Minimum <br />J1- Air <br />A2 Flexible <br />AND <br />B3a - Water <br />C2 - <br />Full <br />Seal <br />E2 - <br />Resealable <br />Open <br />G2 _ <br />Veritication <br />Specified <br />Filtration <br />Impermeable <br />Flexible <br />Natural <br />C1- <br />A1 - Rigid <br />63a - Water <br />Rigid <br />Dt- <br />E3 - <br />F2 - <br />G 2- <br />H3 - Not <br />12 - Not <br />J2 - Not <br />A2 - <br />ermeable <br />Im <br />Full <br />Overlap <br />Open <br />Natural <br />Required <br />Specified <br />Required <br />p <br />C2 _ <br />Seal <br />Flexible <br />Flexible <br />A1 - Rigid <br />B3a - Water <br />C3 - <br />E4-Open <br />F2 - <br />G2 - <br />H3 - Not <br />12 - Not <br />J2 - Not <br />q2 <br />ermeable <br />Im <br />Minimal <br />Partial <br />Seam <br />Open <br />Natural <br />Required <br />Specified <br />Required <br />- <br />p <br />Seal <br />Flexible <br />A1 - Rigid <br />B3b - Water <br />C2 <br />D 2 <br />E4- Open <br />F2 - <br />G2 - <br />H3 - Not <br />12 - Not <br />J2 - Not <br />A2 - <br />Permeable <br />Flexible <br />Partial <br />Seam <br />Open <br />Natural <br />Required <br />Specified <br />Required <br />Flexible <br />Seal <br />Note 1: When designing a ventilation system, care must be taken to balance the static pressure with the input airflow to <br />avoid collapsing the containment or ductwork due to high negative pressure. <br />Note 2: The table occasionally identifies two options for a given component. For example, containment materials (5.3.1) <br />are shown as being either rigid or flexible. If the specifier requires the use of rigid materials only, this restriction <br />must be specified separately. <br />Note 3: Class 4W will capture dislodged paint chips and debris, but will not contain the water used for cleaning. <br />~ When vacuum shrouded waterjetting is employed, ground covers or free-hanging tarpaulins may provide controls <br />equivalent to Class 1 W. <br />TABLE P- POWER TOOL CLEANING* <br />COMBINATIONS OF CONTAINMENT AND VENTILATION SYSTEM COMPONENTS <br />4 of SSPC-Guide 6) <br />Ventilation (5 <br />Containment System <br />. <br />5.4.5 <br />Containment <br />5.3.1 <br />5.3.2 <br />5.3.3 <br />5.3.4 <br />5.3.5 <br />5.4,1 Air <br />5.4.2 <br />Input Air <br />5.4.3 - Air <br />5.4.4 <br />Air <br />Exhaust <br />Classification <br />Containment <br />penetrability <br />Support <br />Joints <br />Entryway <br />Make•Up <br />Flow <br />Pressure <br />Movement <br />Dust <br />Materials <br />Structure <br />Filtration <br />G1- <br />A1- Rigid <br />C1- Rigid <br />pl_ <br />F1 - <br />Forced <br />H2 -Visual <br />11- Minimum <br />J1- Air <br />Class 1 P <br />g~_ Air <br />Impenetrable <br />Cp _ <br />Full <br />E2 - <br />Controlled <br />G2 - <br />Verification <br />Specitied <br />Filtration <br />A2 Flexible <br />Flexible <br />Seal <br />Resealable <br />Natural <br />A1- Rigid <br />B1- Air <br />Impenetrable <br />C1- Rigid <br />p~ <br />E3 - <br />Overlap <br />G2 - <br />H3 • Not <br />12 - Not <br />J2 - Not <br />Class 2P <br />C2 <br />Full <br />F2 - Open <br />Natural <br />Required <br />Specified <br />Required <br />A2 Flexible <br />B2a or B2b - <br />Flexible <br />Seal <br />E4 - Open <br />Air Penetrable <br />Seam <br />A1- Rigid <br />82a or 132b - <br />C3 - <br />D2 <br />partial <br />E4 - 0Pen <br />F2 - Open <br />G2 - <br />H3 - Not <br />i <br />d <br />R <br />12 - Not <br />ecified <br />S <br />J2 - Not <br />Required I <br />Class 3P <br />Air Penetrable <br />Minimal <br />Seal <br />Seam <br />Natural <br />re <br />equ <br />p <br />A-2 Flexible <br />Note 1: When designing a ventila[ion system, care must be taken to balance the static pressure with the input air flow to avoid collapsing the <br />containment or ductwork due to high negative pressure. <br />Note 2: The table occasionally identities two options for a given component. For example, containment materials (5.3.1) are shown as being <br />either rigid or flexible. If the specifier requires the use of rigid materials only, this restriction must be specified separately. <br />~ For hand tool cleaning or vacuum shrouded power tool cleaning, ground covers or free-hanging tarpaulins may provide controls <br />equivalent to Class 1 P. <br />9-14- - 522 <br />
The URL can be used to link to this page
Your browser does not support the video tag.