My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25-REHABILITATION OF THE EAST ELEVATED STORAGE TANK
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
05 May
>
05.14.12
>
25-REHABILITATION OF THE EAST ELEVATED STORAGE TANK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 3:29:04 PM
Creation date
5/11/2012 6:34:32 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SSPC-SP 10/NACE No. 2 <br />January 1, 2007 <br />A11 DEW POINT: Moisture condenses on any surface <br />that is colder than the dew point of the surrounding air. It is <br />therefore recommended that the temperature of the steel <br />surface be at least 3°C (5 °F) above the dew point during dry <br />blast cleaning operations. It is advisable to visually inspect for <br />moisture and periodically check the surface temperature and <br />dew point during blast cleaning operations and to avoid the <br />application of coating over a damp surface. <br />544 <br />
The URL can be used to link to this page
Your browser does not support the video tag.