My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25-REHABILITATION OF THE EAST ELEVATED STORAGE TANK
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
05 May
>
05.14.12
>
25-REHABILITATION OF THE EAST ELEVATED STORAGE TANK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 3:29:04 PM
Creation date
5/11/2012 6:34:32 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION IV <br />STANDARD FORM OF AGREEMENT <br />As Adopted By <br />THE TEXAS SECTION OF <br />THE AMERICAN SOCIETY OF CIVIL ENGINEERS <br />STATE OF TEXAS <br />COUNTY OF LAMAR <br />THIS AGREEMENT, made and entered into this day of , A.D., <br />2011, by and between City of Paris, of the City of Paris, of the State of Texas, acting <br />through the , thereunto duly authorized so to do, Party of the First <br />Part, hereinafter termed OWNER, and of the City of <br />, and State of . Party of the Second Part, hereinafter <br />termed CONTRACTOR. <br />WITNESSETH: That for and in consideration of the payments and agreements <br />hereinafter mentioned, to be made and performed by the Party of the First Part <br />(OWNER), and under the conditions expressed in the bond bearing even date herewith, <br />the said Party of the Second Part (CONTRACTOR), hereby agrees with the said Party of <br />the First part (OWNER) to commence and complete the construction of certain <br />improvements described as follows: <br />Furnish all material and labor for the repair and repainting of the 1.OMG East Elevated <br />Water Storage Tank, located in the 600 block of 251h Street NE, Paris, Texas. <br />in accordance with the base bid and all extra work in connection therewith, under the <br />terms as stated in the General Conditions of the Agreement and at his own proper cost <br />and expense to furnish all the materials, supplies, machinery, equipment, tools, <br />superintendence, labor, insurance, and other accessories and services necessary to <br />complete the said construction in accordance with the conditions and prices stated in <br />the Proposal attached hereto, and in accordance with the Notice to Contractors, General <br />and Special Conditions of Agreement, Plans and other drawings and printed or written <br />explanatory matter thereof, and the Specifications and addenda therefore, as prepared <br />by Dunham Engineering, Inc.,13141 Hill Rd., College Station, Texas 77845, (979) 690- <br />6555 herein entitled the ENGINEER, each of which has been identified by the <br />CONTRACTOR and the ENGINEER, together with the CONTRACTOR'S written <br />Proposal, the General Conditions of the Agreement, and the Performance and Payment <br />Bonds hereto attached; all of which are made a part hereof and collectively evidence <br />and constitute the entire contract. <br />SECTION IV -1 <br />1 349 <br />
The URL can be used to link to this page
Your browser does not support the video tag.