My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25-REHABILITATION OF THE EAST ELEVATED STORAGE TANK
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
05 May
>
05.14.12
>
25-REHABILITATION OF THE EAST ELEVATED STORAGE TANK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 3:29:04 PM
Creation date
5/11/2012 6:34:32 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.03 Reporting and Resolving Discrepancies <br />A. Reporting Discrepancies: <br />Contractor's Review of Contract Documents Before Starting Work: Before undertaking each <br />part of the Work, Contractor shall carefully study and compare the Contract Documents and <br />check and verify pertinent figures therein and all applicable field measurements. Contractor <br />shall promptly report in writing to Engineer any conflict, error, ambiguity, or discrepancy <br />which Contractor discovers, or has actual knowledge of, and shall obtain a written <br />interpretation or clarification from Engineer before proceeding with any Work affected <br />thereby. <br />2. Contractor's Review of Contract Documents During Performance of Work. If, during the <br />performance of the Work, Contractor discovers any conflict, error, ambiguity, or discrepancy <br />within the Contract Documents, or between the Contract Documents and (a) any applicable <br />Law or Regulation ,(b) any standard, specification, manual, or code, or (c) any instruction of <br />any Supplier, then Contractor shall promptly report it to Engineer in writing. Contractor shall <br />not proceed with the Work affected thereby (except in an emergency as required by Paragraph <br />6.16.A) until an amendment or supplement to the Contract Documents has been issued by <br />one of the methods indicated in Paragraph 3.04. <br />3. Contractor shall not be liable to Owner or Engineer for failure to report any conflict, error, <br />ambiguity, or discrepancy in the Contract Documents unless Contractor had actual <br />knowledge thereof. <br />B. Resolving Discrepancies: <br />1. Except as may be otherwise specifically stated in the Contract Documents, the provisions of <br />the Contract Documents shall take precedence in resolving any conflict, error, ambiguiry, or <br />discrepancy between the provisions of the Contract Documents and: <br />a. the provisions of any standard, specification, manual, or code, or the instruction of any <br />Supplier (whether or not specifically incorporated by reference in the Contract <br />Documents); or <br />b. the provisions of any Laws or Regulations applicable to the performance of the Work <br />(unless such an interpretation of the provisions of the Contract Documents would result in <br />violation of such Law or Regulation). <br />3.04 Amending and Supplementing Contract Documents <br />A. The Contract Documents may be amended to provide for additions, deletions, and revisions in <br />the Work or to modify the terms and conditions thereof by either a Change Order or a Work <br />Change Directive. <br />B. The requirements of the Contract Documents may be supplemented, and minor variations and <br />deviations in the Work may be authorized, by one or more of the following ways: <br />EJCDC C-700 Standard General Conditions of the ConstrucHon Contract <br />Copyright O 2007 NaHonal Society of Professional Engineers for E.ICDC. All rights reserved. <br />Pa¢e 9 of 62 <br />~ ~ ~ / ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.