Laserfiche WebLink
by any such owner or occupant against Owner, Engineer, or any other party indemnified <br />hereunder to the extent caused by or based upon Contractor's performance of the Work. <br />B. Removal of Debris During Performance of the Work.• During the progress of the Work <br />Contractor shall keep the Site and other areas free from accumulations of waste materials, <br />rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other <br />debris shall conform to applicable Laws and Regulations. <br />C. Cleaning: Prior to Substantial Completion of the Work Contractor shall clean the Site and the <br />Work and make it ready for utilization by Owner. At the completion of the Work Contractor shall <br />remove from the Site all tools, appliances, construction equipment and machinery, and surplus <br />materials and shall restore to original condition all property not designated for alteration by the <br />Contract Documents. <br />D. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in <br />any manner that will endanger the structure, nor shall Contractor subject any part of the Work or <br />adjacent property to stresses or pressures that will endanger it. <br />6.12 Record Documents <br />A. Contractor shall maintain in a safe place at the Site one record copy of all Drawings, <br />Specifications, Addenda, Change Orders, Work Change Directives, Field Orders, and written <br />interpretations and clarifications in good order and annotated to show changes made during <br />construction. These record documents together with all approved Samples and a counterpart of <br />all approved Shop Drawings will be available to Engineer for reference. Upon completion of the <br />Work, these record documents, Samples, and Shop Drawings will be delivered to Engineer for <br />Owner. <br />6.13 Safety and Pirotection <br />A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety <br />precautions and programs in connection with the Work. Such responsibility does not relieve <br />Subcontractors of their responsibility for the safety of persons or property in the performance of <br />their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall <br />take all necessary precautions for the safety of, and shall provide the necessary protection to <br />prevent damage, injury or loss to: <br />1. all persons on the Site or who may be affected by the Work; <br />2. all the Work and materials and equipment to be incorporated therein, whether in storage on or <br />off the Site; and <br />3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, <br />pavements, roadways, structures, utilities, and Underground Facilities not designated for <br />removal, relocation, or replacement in the course of construction. <br />B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of <br />persons or property, or to the protection of persons or property from damage, injury, or loss; and <br />EJCDC C-700 Standard General Conditions of the Construction Contract <br />Copyright C) 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Page 29 of 62 <br />393 <br />