My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25-REHABILITATION OF THE EAST ELEVATED STORAGE TANK
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
05 May
>
05.14.12
>
25-REHABILITATION OF THE EAST ELEVATED STORAGE TANK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 3:29:04 PM
Creation date
5/11/2012 6:34:32 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shall be delivered to the Engineer and the other pariy to the Contract within 60 days after the start <br />of such event (unless Engineer allows additional time for claimant to submit additional or more <br />accurate data in support of such Claim). A Claim for an adjustment in Contract Price shall be <br />prepared in accordance with the provisions of Paragraph 12.01.13. A Claim for an adjustment in <br />Contract Times shall be prepared in accordance with the provisions of Paragraph 12.02.B. Each <br />Claim shall be accompanied by claimant's written statement that the adjustment claimed is the <br />entire adjustment to which the claimant believes it is entitled as a result of said event. The <br />opposing party shall submit any response to Engineer and the claimant within 30 days after <br />receipt of the claimant's last submittal (unless Engineer allows additional time). <br />C. Engineer's Action: Engineer will review each Claim and, within 30 days after receipt of the last <br />submittal of the claimant or the last submittal of the opposing party, if any, take one of the <br />following actions in writing: <br />1. deny the Claim in whole or in part; <br />2. approve the Claim; or <br />3. notify the parties that the Engineer is unable to resolve the Claim if, in the Engineer's sole <br />discretion, it would be inappropriate for the Engineer to do so. For purposes of further <br />resolution of the Claim, such notice shall be deemed a denial. <br />D. In the event that Engineer does not take action on a Claim within said 30 days, the Claim shall be <br />deemed denied. <br />E. Engineer's written action under Paragraph 10.05.C or denial pursuant to Paragraphs 10.05.C.3 or <br />10.05.1) will be final and binding upon Owner and Contractor, unless Owner or Contractor <br />invoke the dispute resolution procedure set forth in Article 16 within 30 days of such action or <br />denial. <br />F. No Claim for an adjustment in Contract Price or Contract Times will be valid if not submitted in <br />accordance with this Paragraph 10.05. <br />ARTICLE 11 - COST OF THE WORK; ALLOWANCES; UNIT PRICE WORK <br />11.01 Cost of the Work <br />A. Costs Included: The term Cost of the Work means the sum of all costs, except those excluded in <br />Paragaph 11.01.13, necessarily incurred and paid by Contractor in the proper performance of the <br />Work. When the value of any Work covered by a Change Order or when a Claim for an <br />adjustment in Contract Price is determined on the basis of Cost of the Work, the costs to be <br />reimbursed to Contractor will be only those additional or incremental costs required because of <br />the change in the Work or because of the event giving rise to the Claim. Except as otherwise may <br />be agreed to in writing by Owner, such costs shall be in amounts no higher than those prevailing <br />in the locality of the Project, shall not include any of the costs itemized in Paragraph 11.01.13, and <br />shall include only the following items: <br />EJCDC C-700 Standard General Conditions oTthe Construction Contract <br />Copyright 0 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Pape 42 of 62 <br />, 406 <br />
The URL can be used to link to this page
Your browser does not support the video tag.