My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25-REHABILITATION OF THE EAST ELEVATED STORAGE TANK
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
05 May
>
05.14.12
>
25-REHABILITATION OF THE EAST ELEVATED STORAGE TANK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 3:29:04 PM
Creation date
5/11/2012 6:34:32 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
involved detailed inspections of the Work beyond the responsibilities specifically <br />assigned to Engineer in the Contract Documents; or <br />b. there may not be other matters or issues between the parties that might entitle Contractor <br />to be paid additionally by Owner or entitle Owner to withhold payment to Contractor. <br />4. Neither Engineer's review of Contractor's Work for the purposes of recommending payments <br />nor Engineer's recommendation of any payment, including fmal payment, will impose <br />responsibility on Engineer: <br />a. to supervise, direct, or control the Work, or <br />b. for the means, methods, techniques, sequences, or procedures of construction, or the <br />safety precautions and programs incident thereto, or <br />c. for Contractor's failure to comply with Laws and Regulations applicable to Contractor's <br />performance of the Work, or <br />d. to make any examination to ascertain how or for what purposes Contractor has used the <br />moneys paid on account of the Contract Price, or <br />e. to determine that title to any of the Work, materials, or equipment has passed to Owner <br />free and clear of any Liens. <br />5. Engineer may refuse to recommend the whole or any part of any payment if, in Engineer's <br />opinion, it would be incorrect to make the representations to Owner stated in <br />Paragraph 14.02.13.2. Engineer may also refuse to recommend any such payment or, because <br />of subsequently discovered evidence or the results of subsequent inspections or tests, revise <br />or revoke any such payment recommendation previously made, to such extent as may be <br />necessary in Engineer's opinion to protect Owner from loss because: <br />a. the Work is defective, or completed Work has been damaged, requiring correction or <br />replaceinent; <br />b. the Contract Price has been reduced by Change Orders; <br />c. Owner has been required to correct defective Work or complete Work in accordance with <br />Paragraph 13.09; or <br />d. Engineer has actual knowledge of the occurrence of any of the events enumerated in <br />Paragraph 15.02.A. <br />C. Payment Becomes Due: <br />1. Ten days after presentation of the Application for Payment to Owner with Engineer's <br />recommendation, the amount recommended will (subject to the provisions of Paragraph <br />14.02.13) become due, and when due will be paid by Owner to Contractor. <br />EJCDC C-700 Standard General Conditions ot the Construction Contract <br />Copyright C) 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br />PaEe 54 of 62 _ <br />- 418 <br />
The URL can be used to link to this page
Your browser does not support the video tag.