My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-050 RES APPROVING PROPOSAL FOR PROFESSIONAL ENGINEERING SERVICES WITH HAYTER ENG IN CITY'S APPLICATION TO TX WATER DEVELOPMENT BOARD DRINKING WATER STATE REVOLVING FUND LOAN
City-of-Paris
>
City Clerk
>
Resolutions
>
2011-2020
>
2012
>
2012-050 RES APPROVING PROPOSAL FOR PROFESSIONAL ENGINEERING SERVICES WITH HAYTER ENG IN CITY'S APPLICATION TO TX WATER DEVELOPMENT BOARD DRINKING WATER STATE REVOLVING FUND LOAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 10:49:10 AM
Creation date
5/29/2012 1:53:47 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
perform their work in accordance with the contract documents. <br />2.5.3 Interpretations and Clarifications <br />ENGINEER shall issue necessary interpretations and clarifications of the contract <br />documents and in connection therewith prepare work directive changes and change orders, <br />as required. <br />2.5.4 Shop Drawings & Substitutes <br />ENGINEER shall review or take appropriate action, on substitute materials proposed by <br />CONTRACTOR, shop drawings, samples and other data which CONTRACTOR is <br />required to submit, but only for general conformance with the design concept of the <br />project and the information given in the contract documents. Such review sha11 not extend <br />to means, methods, techniques, sequences or procedures of construction or to safety <br />precautions and programs incident thereto. <br />2.5.5 Inspections and Tests <br />ENGINEER shall have authority, as CITY'S representative, to require special inspection <br />or testing of the work, and shall receive and review all certificates of inspections, testing <br />and approvals required by laws, regulations, codes, orders or the contract documents, to <br />determine generally that their content complies with the requirements of, and the results <br />certified indicate compliance with, the contract documents. <br />2.5.6 Disputes between CITY and CONTRACTOR <br />ENGINEER shall act as initial interpreter of the contract documents and judge of the <br />acceptability of the work, and make decisions on all claims of CITY and CONTRACTOR <br />relating to the acceptability of the work or the interpretation of the requirements of the <br />contract documents. ENGINEER shall not be liable for the results of any such <br />interpretations or decisions rendered in good faith. <br />2.5.7 Applications for Payment <br />Based on ENGINEER'S observations as an experienced and qualified design professional, <br />on information provided by the on-site observer and on review of applications for <br />payment and the accompanying data and schedules; ENGINEER shall determine the <br />amount owed to CONTRACTOR and recommend in writing payments to <br />CONTRACTOR. This recommendation will constitute a representation to CITY that the <br />work has progressed to the point indicated, and that, to the best of ENGINEER'S <br />knowledge, information and belief, the quality of such work is generally in accordance <br />with the contract documents. However, ENGINEER will not thereby be deemed to have <br />made exhaustive, continuous or detailed reviews or examinations to check the quality or <br />quantity of CONTRACTOR'S work as it is furnished, beyond the responsibilities <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.