Laserfiche WebLink
City of Paris <br />HOME Program <br />Clarification to bid items <br />Clariticstlon regarding bid items: <br />Base Bid Appliances: <br />• Refrigerator w/ice maker <br />• Range Oven Combinarion <br />• Re-circulating vent hood <br />HVAC clart8cation: <br />• Heat Pump required <br />OPTIONS clari6catton: There needs to be a minimum of 5 options homeowners may choose from for the <br />following items: <br />• Cabinet stains <br />• Hardware (must match light and plumbing fixtures and be consistent throughout the home) <br />• Floor (carpet and vinyl) <br />• Exterior paint trim -(colors that arc not "natural" have to be approved prior to the pre-construction <br />conference. Examples include primary colors, fuchsia, and huquoise). <br />• Counter tops <br />• Brick colors <br />House Plans: <br />• Drop ceiling in hallway is not required. <br />0 All bathr+ooms utilize wall hung lavatories <br />• Window and W rating: refer to City Code <br />• Construction Debris - This is the responsibility of the builder <br />• Foundation - Refer to TX Minimum Construction Specifications - Page 5, Item 6.5 Slab on Grade <br />or City Code, whichever is stricter <br />Note: The builder is responsiblc for all due diligence and the understanding of all City codes, ordinances and <br />permits required by the City and needs to bid accordi.ngly. <br />Example: If the City requires a survey for foundation, setbacks or other testing required by the City <br />ordinances, the builder is responsible for those costs. Please bid accordingly. <br />If you 6ave any questions regarding any items, please ca11 Rachel Edwards with Resource Mattagement & <br />Consulting Co. at 903/7846439. <br />Sincerely, <br />Rachel Edwards <br />Resource Management & Consulting Co. <br />P.O. Box 6038Paris, TX 75461 <br />903/784-6439 <br />