My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-054 RES AWARDING CONTRACT FOR REHABILITATION OF EAST ELEVATED STORAGE TANK TO CLASSIC PROTECTIVE COATINGS INC
City-of-Paris
>
City Clerk
>
Resolutions
>
2011-2020
>
2012
>
2012-054 RES AWARDING CONTRACT FOR REHABILITATION OF EAST ELEVATED STORAGE TANK TO CLASSIC PROTECTIVE COATINGS INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 10:55:18 AM
Creation date
5/31/2012 4:36:04 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JJrlr-Jt' O/IVHIJC IVU. J <br />January 1, 2007 <br />Section 5: Blast Cleaning Methods and <br />Operation <br />the film thickness of coating applied over the surface profile <br />is in Paragraphs A7 and AS of Appendix A. <br />5.1 Clean, dry compressed air shall be used for nozzle <br />blasting. Moisture separators, oil separators, traps, or other <br />equipment may be necessary to achieve this requirement. <br />5.2 Any of the following methods of surface prepara- <br />tion may be used to achieve a commerciai blast cleaned <br />surface: <br />5.2.1 Dry abrasive blasting using compressed air, blast <br />nozzles, and abrasive. <br />5.2.2 Dry abrasive blasting using a closed-cycle, recir- <br />culating abrasive system with compressed air, biast nozzle, <br />and abrasive, with or without vacuum for dust and abrasive <br />recovery. <br />5.2.3 Dry abrasive blasting using a closed-cycle, recircu- <br />lating abrasive system with centrifugal wheels and abrasive. <br />5.3 Other methods of surface preparation (such as wet <br />abrasive blast cleaning) may be used to achieve a commer- <br />cial blast cleaned surface by mutual agreement between <br />those responsible for establishing the requirements and those <br />responsible for performing the work. Information on the use of <br />inhibitors to prevent the formation of rust immediately after wet <br />abrasive blast cleaning is in Paragraph A5 of Appendix A. <br />Section 6: Blast Cleaning Abrasives <br />6.1 The selection of abrasive size and rype shall be based <br />on the type, grade, and surface condition of the steel to be <br />cleaned, the type of blast cleaning system used, the finished <br />surface to be produced (cleanliness and surface profile [rough- <br />ness]), and whether the abrasive will be recycled. <br />6.2 The cleanliness and si2e of recycled abrasives shall <br />be maintained to ensure compliance with this standard. <br />6.3 The blast cleaning abrasive shall be dry and free of <br />oil, grease, and other contaminants as determined by the test <br />methods found in SSPC-AB 1, SSPC-AB 2, and SSPC-AB 3. <br />6.4 Any limitations on the use of specific abrasives, the <br />quantity of contaminants, or the degree of allowable embed- <br />ment shall be included in the procurement documents (project <br />specification) covering the work, because abrasive embedment <br />and abrasives containing contaminants may not be accept- <br />able for some service requirements. Additional information on <br />abrasive selection is in Paragraph A6 of Appendix A. <br />6.5 When a coating is specified, the cleaned surtace <br />shall be roughened to a degree suitable for the specified <br />coatina svstem. Additional information on surface profile and <br />Section 7: Procedures Following Blast Cleaning <br />and Immediately Prior To Coating <br />7.1 Visible deposits of oil, grease, or other contaminants <br />shail be removed according to SSPC-SP 1 or another method <br />agreed upon by those parties responsible for establishing <br />the requirements and those responsible for performing the <br />work. <br />7.2 Dust and loose residues shall be removed from <br />prepared surtaces by brushing; blowing off with clean, dry <br />air; vacuum cleaning; or other methods agreed upon by <br />those responsible for establishing the requirements and those <br />responsible for performing the work. <br />7.2.1 The presence of toxic metals in the abrasives or <br />coating being removed may place restrictions on the methods <br />of cleaning permitted. The chosen method shall comply with <br />all applicable regulations. <br />7.2.2 Moisture separators, oil separators, traps, or other <br />equipment may be necessary to achieve clean, dry air. <br />7.3 After blast cleaning, any remaining surface imperfec- <br />tions (e.g., sharp fins, sharp edges, weld spatter, burning siag, <br />scabs, slivers) shall be removed to the extent required by the <br />procurement documents (project specification). Any damage <br />to the surface profile resulting from the removal of surface <br />impertections shall be corrected to meet the requirements of <br />Paragraph 6.5. Additional information on surface impertections <br />is in Paragraph A4 of Appendix A. <br />7.4 Immediately prior to coating application, the entire <br />surface shall comply with the degree of cleaning specified in this <br />standard. Any visible rust that forms on the surface of the steel after <br />blast cleaning shall be removed by recleaning the rusted areas <br />before coating. Information on chemical contamination, rust-back <br />(rerusting), and the effect of dew point (surface condensation) is <br />in Paragraphs A9, A10, and A11 of Appendix A. <br />Section 8: Inspection <br />8.1 Work performed and materials supplied under this <br />standard are subject to inspection by a representative of those <br />responsible for establishing the requirements. Materials and <br />work areas shall be accessible to the inspector. The proce- <br />dures and times of inspection shall be as agreed upon by <br />those responsible for establishing the requirements and those <br />responsible for performing the work. <br />8.2 Conditions not complying with this standard shall be <br />corrected. In the case of a dispute, an arbitration or settlement <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.