Laserfiche WebLink
40. Shop Drawings-All drawings, diagrams, illustrations, schedules, and other data or <br />information which are specifically prepared or assembled by or for Contractor and submitted <br />by Contractor to illustrate some portion of the Work. <br />41. Site-Lands or areas indicated in the Contract Documents as being furnished by Owner upon <br />which the Work is to be performed, including rights-of-way and easements for access thereto, <br />and such other lands furnished by Owner which are designated for the use of Contractor. <br />42. Specifications-That part of the Contract Documents consisting of written requirements for <br />materials, equipment, systems, standards and workmanship as applied to the Work, and <br />certain administrative requirements and procedural matters applicable thereto. <br />43. Subcontractor-An individual or entity having a direct contract with Contractor or with any <br />other Subcontractor for the performance of a part of the Work at the Site. <br />44. Substantial Completion-The time at which the Work (or a specified part thereo fl has <br />progressed to the point where, in the opinion of Engineer, the Work (or a specified part <br />thereo fl is sufficiently complete, in accordance with the Contract Documents, so that the <br />Work (or a specified part thereof) can be utilized for the purposes for which it is intended. <br />The terms "substantially complete" and "substantially completed" as applied to all or part of <br />the Work refer to Substantial Completion thereof. <br />45. Successful Bidder-The Bidder submitting a responsive Bid to whom Owner makes an <br />award. <br />46. Supplementary Conditions-That part of the Contract Documents which amends or <br />supplements these General Conditions. <br />47. Supplier-A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a <br />direct contract with Contractor or with any Subcontractor to furnish materials or equipment to <br />be incorporated in the Work by Contractor or Subcontractor. <br />48. Underground Facilities-All underground pipelines, conduits, ducts, cables, wires, <br />manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements <br />containing such facilities, including those that convey electricity, gases, steam, liquid <br />petroleum products, telephone or other communications, cable television, water, wastewater, <br />storm water, other liquids or chemicals, or traffic or other control systems. <br />49. Unit Price Work-Work to be paid for on the basis of unit prices. <br />50. Work-The entire construction or the various separately identifiable parts thereof required to <br />be provided under the Contract Documents. Work includes and is the result of performing or <br />providing all labor, services, and documentation necessary to produce such construction, and <br />furnishing, installing, and incorporating all materials and equipment into such construction, <br />all as required by the Contract Documents. <br />51. Work Change Directive-A written statement to Contractor issued on or after the Effective <br />Date of the Agreement and signed by Owner and recommended by Engineer ordering an <br />EJCDC G700 Standard General Conditions of the ConstrucHon Contract <br />Copyright (D 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Psee 4 of 62 _ <br />