Laserfiche WebLink
E. Furnish, Install, Perform, Provide: <br />l. The word "furnish," when used in connection with services, materials, or equipment, shall <br />mean to supply and deliver said services, materials, or equipment to the Site (or some other <br />specified location) ready for use or installation and in usable or operable condition. <br />2. The word "install," when used in connection with services, materials, or equipment, shall <br />mean to put into use or place in final position said services, materials, or equipment complete <br />and ready for intended use. <br />3. The words "perform" or "provide," when used in connection with services, materials, or <br />equipment, shall mean to furnish and install said services, materials, or equipment complete <br />and ready for intended use. <br />4. When "furnish," "install," "perform," or "provide" is not used in connection with services, <br />materials, or equipment in a context clearly requiring an obligation of Contractor, "provide" <br />is implied. <br />F. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known <br />technical or construction industry or trade meaning are used in the Contract Documents in <br />accordance with such recognized meaning. <br />ARTICLE 2 - PRELIMINARY MATTERS <br />2.01 Delivery of Bonds and Evidence of Insurance <br />A. When Contractor delivers the executed counterparts of the Agreement to Owner, Contractor shall <br />also deliver to Owner such bonds as Contractor may be required to furnish. <br />B. Evidence of Insurance: Before any Work at the Site is started, Contractor and Owner shall each <br />deliver to the other, with copies to each additional insured identified in the Supplementary <br />Conditions, certificates of insurance (and other evidence of insurance which either of them or any <br />additional insured may reasonably request) which Contractor and Owner respectively are <br />required to purchase and maintain in accordance with Article 5. <br />2.02 Copies of Documents <br />A. Owner shall furnish to Contractor up to ten printed or hard copies of the Drawings and Project <br />Manual. Additional copies will be furnished upon request at the cost of reproduction. <br />2.03 Commencement of Contract Times; Notice to Proceed <br />A. The Contract Times will commence to run on the thirtieth day after the Effective Date of the <br />Agreement or, if a Notice to Proceed is given, on the day indicated in the Notice to Proceed. A <br />Notice to Proceed may be given at any time within 30 days after the Effective Date of the <br />Agreement. In no event will the Contract Times commence to run later than the sixtieth day after <br />the day of Bid opening or the thirtieth day after the Effective Date of the Agreement, whichever <br />date is earlier. <br />EJCDC C-700 Standard General Conditions otthe Construction Contract <br />Copyright C) 2007 National Society of Professional Engineers for EJCDC. All rig6ts reserved. <br />Paee 6 of 62 _ <br />