My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-054 RES AWARDING CONTRACT FOR REHABILITATION OF EAST ELEVATED STORAGE TANK TO CLASSIC PROTECTIVE COATINGS INC
City-of-Paris
>
City Clerk
>
Resolutions
>
2011-2020
>
2012
>
2012-054 RES AWARDING CONTRACT FOR REHABILITATION OF EAST ELEVATED STORAGE TANK TO CLASSIC PROTECTIVE COATINGS INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 10:55:18 AM
Creation date
5/31/2012 4:36:04 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 4- AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; <br />HAZARDOUS ENVIRONMENTAL CONDITIONS; REFERENCE POINTS <br />4.01 Availability of Lands <br />A. Owner shall furnish the Site. Owner shall notify Contractor of any encumbrances or restrictions <br />not of general application but specifically related to use of the Site with which Contractor must <br />comply in performing the Work. Owner will obtain in a timely manner and pay for easements for <br />permanent structures or permanent changes in existing facilities. If Contractor and Owner are <br />unable to agree on entitlement to or on the amount or extent, if any, of any adjustment in the <br />Contract Price or Contract Times, or both, as a result of any delay in Owner's furnishing the Site <br />or a part thereof, Contractor may make a Claim therefor as provided in Paragraph 10.05. <br />B. Upon reasonable written request, Owner shall furnish Contractor with a current statement of <br />record legal title and legal description of the lands upon which the Work is to be performed and <br />Owner's interest therein as necessary for giving notice of or filing a mechanic's or construction <br />lien against such lands in accordance with applicable Laws and Regulations. <br />C. Contractor shall provide for all additional lands and access thereto that may be required for <br />temporary construction facilities or storage of materials and equipment. <br />4.02 Subsurface and Physical Conditions <br />A. Reports and Drawings: The Supplementary Conditions identify: <br />1. those reports known to Owner of explorations and tests of subsurface conditions at or <br />contiguous to the Site; and <br />2. those drawings known to Owner of physical conditions relating to existing surface or <br />subsurface structures at the Site (except Underground Facilities). <br />B. Limited Reliance by Contractor on Technical Data Authorized.• Contractor may rely upon the <br />accuracy of the "technical data" contained in such reports and drawings, but such reports and <br />drawings are not Contract Documents. Such "technical data" is identified in the Supplementary <br />Conditions. Except for such reliance on such "technical data," Contractor may not rely upon or <br />make any claim against Owner or Engineer, or any of their officers, directors, members, partners, <br />employees, agents, consultants, or subcontractors with respect to: <br />1. the completeness of such reports and drawings for Contractor's purposes, including, but not <br />limited to, any aspects of the means, methods, techniques, sequences, and procedures of <br />construction to be employed by Contractor, and safety precautions and programs incident <br />thereto; or <br />2. other data, interpretations, opinions, and information contained in such reports or shown or <br />indicated in such drawings; or <br />3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such <br />other data, interpretations, opinions, or information. <br />EJCDC C-700 Standard General Conditions of the ConstrucHon Contract <br />Copyright C) 2007 NaHonal Society of Professional Engineers for EJCDC. Ail rights reserved. <br />Pase 11 of 62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.