Laserfiche WebLink
BID <br />PROJECT NAME: <br />PROJECT NUMBER: <br />THIS BID IS SUBMITTED TO: <br />Manhole Rehabilitation <br />TDA #729599 and HEI #180043-28A <br />City of Paris <br />The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an <br />agreement with OWNER in the form included in the Contract Documents to perform and <br />furnish all Work as specified or indicated in the Contract Documents for the Contract <br />Price and within the Contract Time indicated in this Bid and in Accordance with the other <br />terms and conditions of the Contract Documents. <br />2. BIDDER accepts all of the terms and conditions of the Advertisement for Bids and <br />Instructions to Bidders, including, without limitation, those dealing with the disposition <br />of Bid security. This Bid will remain subject to acceptance for ninety (90) days after the <br />day of Bid opening. BIDDER will sign and submit the Agreement with the Bonds and <br />other documents required by the Bidding Requirements within fifteen (15) days after the <br />date of OWNER'S Notice of Award. <br />In submitting this Bid, BIDDER represents, as more fully set forth in the Agreement, <br />that: <br />(a) BIDDER has examined copies of all the Bidding Documents and of the following <br />Addenda, receipt of all which is hereby acknowledged: <br />Number Date <br />(b) BIDDER has familiarized itself with the nature and extent of the Contract <br />Documents, work, site, locality, and all local conditions and laws and regulations <br />that in any manner may affect cost, progress, performance or furnishing of the <br />Work. <br />(c) BIDDER has obtained and carefully studied (or assumes responsibility for <br />obtaining and carefully studying) all such examinations, investigations, <br />expIorations, tests and studies which pertain to the subsurface or physical <br />conditions at the site or otherwise may affect the cost, progress, performance or <br />furnishing of the Work as BIDDER considers necessary for the performance or <br />furnishing the work at the contract price, within the contract time and in <br />13 <br />