Laserfiche WebLink
The manholes shall not have steps. <br />The manhole walls may be pre-cast manhole sections. All voids in the cement surface will be <br />repaired. Lifting holes shall be repaired with hydraulic cement prior to manhole testing. <br />If, after the manhole has been backfilled, the walls or invert show evidence of groundwater <br />entering the manhole, the leak shall be repaired. Repairs shall be made by gouging out the defect <br />in the concrete and repairing it with nonshrink grout, hydraulic cement, or other acceptable <br />waterproofing agents. The completed manhole shall still pass vacuum testing as described <br />elsewhere herein. <br />Where manhole depth is measured for payment, the payment shall be measured from the top of <br />the cast iron cover to the outlet flowline of the manhole. Where manholes aze a unit price item, <br />the itern shall include the inflow insert and chimney seal as specified herein. <br />The CONTRACTOR shall be responsible for any additional cost incurred if field conditions <br />necessitate a change in manhole depth after the pre-cast units are ordered. <br />Grout all interior joints with hydraulic cement. <br />All new/replacement manholes shall be vacuum tested as described elsewhere herein. <br />All new/replacement manholes located in or directly next to pavement shall have a concrete pad <br />constructed around the ring. <br />The use of brick for manhole construction is not allowed in this project. Similazly, the use of <br />bricks to adjust manhole rings to grade is not acceptable. Where the adjustment of manhole ring <br />elevation is required, the CONTRACTOR shall utilize the precast concrete adjustment rings for <br />this purpose. All interior concrete surfaces of all new manholes shall be coated with a corrosion <br />resistant coating as specified elsewhere herein. A water stop such as Ram-Neck sha11 be used <br />between manhole and grade rings, as necessary. <br />All interior surfaces of all manholes constructed in this project shall be coated with 2-part <br />corrosion resistant coating. The coating shall consist of a primer coat of Tnemec Series 66, Hi- <br />Build Epoxoline followed by a finish coat of the same material. Coatings shall be installed in <br />strict conformance with the coating manufacturers recommendation, including a minimum 28- <br />day curing period for all concrete surfaces prior to coating. Color sha11 be tan or light gray. <br />Coating shall be applied before installation, by the CONTRACTOR, once the precast manhole <br />sections have been delivered to the job site, or factory applied. <br />Fiberglass Manhole <br />Fiberglass reinforced manholes scheduled as replacements shall be manufactured from <br />commercial grade polyester resin or other suitable polyester or vyinyl ester resins with fiberglass <br />reinforcements. Manhole shall be a one piece unit manufactured to meet or exceed all <br />91 <br />