Laserfiche WebLink
MEMORANDUM <br />TO: Mayor and City Council <br />Planning and Zoning Commission <br />FROM: Shawn Napier, <br />Director of En 4ng, Planning and Development <br />DATE: June l, 2012 <br />SUBJECT: D&P Addition CB 281 Final Plat <br />I have reviewed the final plat of the above referenced addition. It appears that the final plat <br />complies with the City of Paris subdivision regulations with the following exception. <br />1. Correct the last paragraph in the field notes that shows a bearing of North 85-degrees, it <br />conflicts with the drawing that shows North 88-degrees. <br />2. Change the owner's name in the dedication, guarantee and notary lines. <br />3. Provide minimum finished floor elevations for all existing and proposed buildings and <br />structures. <br />4. Add a note concerning how the 20-foot utility easement and the 40-foot drainage <br />easement where created. <br />I recommend approval of the final plat upon submission of a corrected mylar copy with <br />signatures of the surveyor and owner prior to noon on June 8, 2012. <br />cc: John Godwin, City Manager <br />Brandon Chaney, P.E., R.P.L.S., Chaney Engineering Inc. <br />Dan Blount <br />23 <br />